5
A
B
X 4
X 4
X 4
X 4
C
D
D
A
C
A
A
AA
AA
B
B
AA
C
A
1
1
1. Insert base cap (B) into post (A), then using screw (AA) secure base flange (C) on the bottom
of post (A). Place roof cap (D) on the top of post (A).
Repeat for remaining 3 posts (A).
A
2
D
2