background image

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

Detailed instructions with diagrams:…. 

Basic overview 

of what I am trying to achieve…

 

“For those of us who do not like reading instructions….” 

Rib 
Pan 

(F) Channels with 

cutouts (as shown). 

 

Note that the cutouts go to the inside of the panel to 

allow easy fitment of end walls on assembly 

Inside 

Outside 

1

: Front Wall 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 2 

Hing

Hing

Spacer 

Channel 

C. 

Outside: 

Fix 

channel  at  corners 
and  every  2nd  rib 

between  and  thru  door 

jambs and spacer 

D. 

Inside

: One fixing per sheet 

at each end up thru channel 
underside  and  thru  door 
jambs & spacer 

E.  Fit padbolt to the outside of 

door.  

Note:  Higher  side  of  channel 

goes to inside of shed 

Door jamb on inside 

Just join the sheets together and fit the channels to the top and bottom of the sheets as a 
framing to make 4 walls and the roof. Follow these basic steps:…. 
1.  Front  Wall: 

Layout 2 x (A) 1980mm sheets, (C) sheet with door jamb attached, and (D) 

door with the sheet attached beside them to your preferred configuration and join sheets. Cap 

the sheets with (F) 3745 channels (2 sided cutout - Top and 1 sided cutout - bottom). Use (H) 

Door spacers to make sure door fits gap OK (they sit on top of the jambs) and fix (Rivet or 
screw) at every 2nd rib. Attach door spacer at each end thru door jambs and channels. 4 fix-

ings underneath into sheeting pan top and bottom. Fit padbolt. 

 

2. 

Back: 

Join 5 (A) 1830mm Sheets together. Cap with (F) Channels and fix thru every 2nd rib 

and at least 1 fixing per sheet thru the back of the channel into the pan of the sheeting. 

More 

in high wind areas.

 

3. 

Roof

Join 5 (A) 1830mm Sheets together. Cap with (E) 3745mm Channels. Fix @ every 2nd rib. Attach (G) 

1830 “L”s to ribs at each end of sheeting at corners and 600mm apart in between. 

4. 

End  walls

: Join the 2 (B) sheets together that slope the same way. Cap with (E) 1515mm channels and fix 

at corners and every 2nd rib in between. 2 -3 fixings up underneath into pan of sheeting, top and Bottom. 

5. 

Assembly

: You have now made up your panels. It’s just, Join the corners and put the roof on! Make sure 

you have at least 6 fixings down each corner when you join the walls. Fix one side of the roof on thru the 

(G) “L” into the top channel on one end wall approx 500mm apart. Check overhang and fix to the other end 

wall. You now need to fix down thru every 2nd pan in the roof into the top channels on the front and back 
walls. 

More  in  high  wind  areas. 

Please make sure that you have removed all swarf filings as the rust spots 

that they produce may hinder any warranty claims.  

 

Generally most fixings are spaced at 300mm apart

 

Keep fixings in the pans as close to the ribs as possible for added strength. 
Ribs will always protrude to the outside of the shed. 

Extra

 internal fixings is strongly recommended in high wind areas. 

Channels will come short 
of ends of sheeting by 10 

- 15mm on all panels 

Fix through top and 

bottom of channels into 
Door jamb & spacer 

Drawings are diagrammatic and 

are not necessarily to detail. 

A.Join (A) 1980 sheets to (D) and 

(C) 740mm sheets depending on 
which way door is to swing. 

B.Use (H) door spacer to deter-

mine the correct opening size by 
placing on the bottom flange of 

the door jambs. Then fit (F) 
channels to tops and bottoms of 
sheeting.  

You will need: 

(A) 2 x 1980 sheets 
(C) 740 wide sheet with door jamb 
(D) Pre-hinged door and 740 sheet 
(F) 

1

 top and 

1

 bottom Channel 

(H) 2 x Door spacers 

To hinge the door on the opposite 
side - simply put the top channel on 

the bottom and bottom on top. 

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

2: Back Wall 

A. Join  5  (A)  sheets  together  with 

2  fixings  thru  the  overlapping 
ribs making sure the ends of the 
sheets are flush. 

B.  Cap  sheeting  with  (F)  channels 

putting the cutouts top and bot-
tom same as the front wall. 

C. Fix  the  channels  thru  the  end 

ribs and every 2nd rib between. 

D. Make  sure  you  put  at  least  1 

fixing per sheet up thru the un-
derside  of  the  channel  into  the 
pan of the sheet.  

(A) 

(F) 

(F) 

(E) 

(E) 

You need: 

2  x  (E)  Chan-
nels 
5 x (A) Sheets 

(A) 

(E) 

(B) 

A.  Join 2 Left (B) sheets together to give a slope at the top. 
B.  Cap sheeting with (E) 1515mm channels. 

C. Fix the channels at the corners and every 2nd rib in between. 

D. 3 fixings up underneath thru channel into pan of sheet 

E. 

Perform the same again for the Right side

4: End Walls 

A.  Join 5 (A) sheets together same as 

the back. 

B.  Cap  sheeting  with  (E)  3745mm 

channels. 

C. Fix  the  channels  every  2nd  rib  but 

not the corners at this stage 

D. Place the short flange of the “L” on 

top of the rib at 1 end. Make sure 
ends  are  flush  with  sheeting  and 
put 

1

  fixing  in  the  centre  to  hold 

the  “L”.  Fix  the  corners  thru  the 
channels  and 

1

 more between  the 

corner  and  the  centre  fixing.  Per-
form the same at the other end. 5 

fixings ea “L” 

You need: 

2 x (B) Sheets - Left 
2 x (B) Sheets - Right 
2 x (E) Channels 

Door Brace Kit 

A.  The Door braces can be fitted now or after 

you have assembled your shed. 

B.  Tuck one end of the “Z” between the bot-

tom  channel  of  the 

inside

  of  the  door  and 

the sheet. Do the same at the top overlap-
ping in the centre behind the padbolt. If you 

have  a  locking  “T”  handle  you  will  have  to 
run  the  “Z”s  the  opposite  way  to  the  dia-
gram. 

C.  Fix the “Z”s at the ends and in the centre to 

the channel it is tucked under and thru the 
overlap in the centre. 2 or 3 more rivets will 

be required thru the door sheeting into the 
“Z”, but they will need to be fixed through 
from  the  outside  of  the 

door  for  neater  appear-
ance. 

D.  You  may  need  to  cut  or 

bend the flange at the bot-

tom  and  top  of  the  “Z”  if 

it  catches  on  door  jamb 
when opening or closing. 

Padbolt 

“Z” Brace 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 3 

3: Roof 

Inside 

Channels will end 

15 - 20mm short 
at tops of end 
walls and 10 - 15 

at bottoms 

(E) 

You need: 

2 x (F) Channels 
5 x (A) Sheets 

(G) 

(G) 

Отзывы: