Carlisle
6/4ft log and tool store
7
Step 21
Step 22
Secure the top hinge in place using more of the black
hinge screws. Repeat steps 20 - 22 for any further
doors as required.
Stand the dividing panel in position and using the
65mm screws, fix it to the rear batten. The dividing
panel needs to be a tight fit but if
too
snug then
release the front centre post at the roof point...
Step 23
Step 24
...then pull the centre post forward slightly to allow
room to slot the panel into place, then reposition the
post and fix again at the roof. Now screw the dividing
panel to the front post.
The tool store section of the store is now complete
and ready for the final stage.