background image

 

GS65011-EVBEZ 

EZDrive

TM

 Open Loop Boost Evaluation Board 

User’s Guide 

_____________________________________________________________________________________________________________________ 

 

GSWPT-EVBEZ Rev190621 

© 2019 GaN Systems Inc. 

www.gansystems.com                          8 

 

Please refer to the Evaluation Board/Kit Important Notice on page 15

 

 

A Boost converter’s output voltage is higher than the input voltage, V

IN.

  Under high duty 

cycle and low load/no load operating conditions, the output voltage will rise and 
potentially damage the GaN device. To avoid an overvoltage on the GaN device, two 
actions are recommended. First, always apply a load at the output voltage, V

OUT

.  

Secondly, pre-set the PWM signal before applying power to V

IN

Figure 4

 shows the block 

diagram of PWM signal generation inside the TL1454ACNSR. 
 

PWM output

Duty Cycle Control 

Freq control input

RT=120pF; 

RT=R3+RT2=25k

Ω

;

Fsw=200kHz

Vpk=1.8V

Vvalley=1.2V

000 ohm)

 

Figure 4 •

 

GS65011-EVBEZ PWM signal adjustment diagram 

 

The PWM signal is adjusted by tuning the controller’s peripheral resistors, R11 and R3. Use the 

Table 1

 to set the duty cycle with R11. Use 

Table 2

 to set the switching frequency with R3.  

Select the appropriate values according to your own specifications and requirements. For a 

safe start up, 10% duty cycle and frequency 250kHz is recommended. 
 

Table 1

 • 

PWM Duty Cycle Setting up table 

 

R11 (

Ω

IN1+ (V) 

Duty Cycle 

Case 1 

1000 

1.83 

0 % 

Case 2 

850 

1.74 

10 % 

Case 3 

500 

1.52 

47 % 

Case 4 

1.15 

100 % 

 
Table 2

 • 

PWM Frequency Setting up table 

 

f

SW_MIN

 

f

SW

 

f

SW_MAX

 

R3 (k

Ω

20 

CT (pF) 

120 

120 

120 

f

SW

 (kHz) 

200 

500 

900 

 

 

 

Содержание GS65011-EVBEZ

Страница 1: ...___________________________________________________ GSWPT EVBEZ Rev190621 2019 GaN Systems Inc www gansystems com 1 Please refer to the Evaluation Board Kit Important Notice on page 15 GS65011 EVBEZ G...

Страница 2: ...ere injury or death Follow all locally approved safety procedures when working around high voltage Never leave the board operating unattended After it is de energized always wait until all capacitors...

Страница 3: ...r with integrated driver The EZDriveTM circuit provides design control for the optimization of efficiency and EMI It is adaptable to any power level any frequency and any LLC and PFC controller The bo...

Страница 4: ...Z Rev190621 2019 GaN Systems Inc www gansystems com 4 Please refer to the Evaluation Board Kit Important Notice on page 15 Evaluation Board Assembly Overview The EVB is assembled with the EZDriveTM ci...

Страница 5: ...Rev190621 2019 GaN Systems Inc www gansystems com 5 Please refer to the Evaluation Board Kit Important Notice on page 15 Block Diagram and Schematic The block diagram and schematic of the evaluation b...

Страница 6: ...______________________________________________________________________________________________________________ GSWPT EVBEZ Rev190621 2019 GaN Systems Inc www gansystems com 6 Please refer to the Evalu...

Страница 7: ...iveTM circuit is shown in the dotted box in Figure 2 It is a low cost low component count circuit composed of two Zener diodes one capacitor three resistors and one diode ZDEZ1 ZDEZ2 clamp the positiv...

Страница 8: ...WM signal before applying power to VIN Figure 4 shows the block diagram of PWM signal generation inside the TL1454ACNSR PWM output Duty Cycle Control Freq control input RT 120pF RT R3 RT2 25k Fsw 200k...

Страница 9: ...oltage 0Vdc VIN 200Vdc and low voltage 5Vdc VCC 12Vdc power supplies Connector for the output load User friendly probe connector and vias for VGS VDS measurement and other performance verification The...

Страница 10: ...www gansystems com 10 Please refer to the Evaluation Board Kit Important Notice on page 15 Evaluation Test Setup Figure 5 shows the test setup for the GS65011 EVBEZ evaluation board Make sure that th...

Страница 11: ...requency 250kHz 2 Apply VCC 5VDC VCC 12VDC to Vcc and Vcc use T_GS MMCX JACK or G SS VIAS for VGS monitoring 3 Check the VGS waveform and fine tune the PWM frequency by tuning R3 and duty cycle by tun...

Страница 12: ...Drain via and Source via designed for this purpose See Figure 6 for proper probe technique and Figure 5 for the location of VGS and VDS measure vias Use a high voltage passive differential probe for t...

Страница 13: ..._______________________________________________________________________________ GSWPT EVBEZ Rev190621 2019 GaN Systems Inc www gansystems com 13 Please refer to the Evaluation Board Kit Important Noti...

Страница 14: ...ults The evaluation results are shown in Figures 7 through 10 Figure 7 Test Results at half load VGS VDS fsw 250kHz 6V 6V IL 400V Duty cycle 21 Test conditions VIN 200V VOUT 400V IOUT 0 25A POUT 100W...

Страница 15: ...re vs load Test conditions VIN 200V VOUT 400V fSW 250kHz Figure 10 Efficiency VIN vs load Test conditions Duty cycle 40 8 VOUT 400V fSW 250kHz 96 96 70 97 25 97 27 28 4 34 8 39 8 44 8 25 35 45 55 65 7...

Страница 16: ...agnify the thermal management requirements The evaluation board is intended for bench evaluation under low ambient temperature and with convection cooling The addition of heat sinking and forced air c...

Страница 17: ...t the specifications indicated in the User s Guide the board kit may be returned within 30 days from the date of delivery for a full refund THE FOREGOING WARRANTY IS THE EXCLUSIVE WARRANTY MADE BY THE...

Страница 18: ...e not designed authorized or warranted for use in lifesaving life sustaining military aircraft or space applications nor in products or systems where failure or malfunction may result in personal inju...

Отзывы: