Gammon GTP-9330 Series Скачать руководство пользователя страница 3

 

 

INSTRUCTION 6414 

REVISED 6/20/18 

Page 3 of 4 

GAMMON TECHNICAL PRODUCTS, INC. 
INSTRUCTIONS: INSTALLATION AND OPERATION 
ONE-CC WATER PROBE  
GTP-9330 

 

 

3.

 

Separate  the  2  sections  of  the  pump 
by  unscrewing  the  piston  (insulated 
by  heat  shrink)  from  the  hardcoat 
anodized 

cylinder. 

 

4.

 

Hold  the  cylinder  vertically  in  one 
hand  with  the  small  end  down  and 
resting  on  a  finger  tip.  Fill  the 
cylinder  to  the  top  with  clean  water. 
DO  NOT  USE  DISTILLED  OR 
DEIONIZED 

WATER. 

 

5.

 

Insert  the  piston  and  rotate  until  the 
first thread is engaged. There is now 
1  cc  (1  ml)  of  water  in  the  cylinder 
for 

performing 

the 

test. 

 

6.

 

Insert the small end of the cylinder to 
connect it to the probe assembly and 
rotate 

both  halves

  of  the  water 

injection  pump  clockwise  to  engage 
the 

bayonet 

pin. 

 
CAUTION: NEVER ATTACH THE 
WATER PUMP IF THE PISTON IS 
NOT  INSTALLED.  FUEL  WILL 
BE 

RELEASED.  

 

7.

 

Rotate  the  piston  (section  insulated 
with  heat  shrink)  clockwise  rapidly 
to  inject  one  cc  of  water  into  the 
probe. If a “water in sump” signal is 
received,  the  probe  is  operating 
correctly.  In  some  cases,  a  second 
injection  may  be  necessary.  If  the 
signal  is  not  received,  the  probe  has 
failed 

the 

test. 

 

 

 
 
 

 
 

Отзывы: