
22
Attach cable to the roof with clamps and cable spacers.
Drip
Loop
Figure 12. Fixing the clamps to the shingle at the top of the triangle.
Figure 13. Fixing clamps to the edge of the roof with gutters.
At the bottom of the triangles, along the edge of the roof at the gutter, form a
“drip loop” above the edge of the roof to direct melt water into the gutter or to
the ground. There should be at least 2-inches between the bottom of the drip
loop and the bottom of the gutter.