HCEN12745 Revision 10.2016
Program version 2.xx
AK 98 Dialysis Machine - Attentions
B:173
604 Venous clamp test failed
604 Venous clamp test failed
Check venous line placement in venous clamp.
To continue press Confirm.
Appears:
When the venous clamp test fails.
Machine actions:
The machine stops the venous clamp test until the attention
is confirmed.
Operator action:
Check that the blood lines are correctly inserted into the
venous clamp and confirm the attention.
Mute time:
2 minutes.
Содержание AK 98
Страница 1: ...AK 98 Dialysis Machine Operator s Manual Program version 2 xx Order number MHCEN12745 10 16 ...
Страница 45: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 106: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 128: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 144: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 166: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 196: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 198: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 208: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 268: ...This page is intentionally left blank This page is intentionally left blank ...
Страница 275: ...HCEN12745 Revision 10 2016 Program version 2 xx AK 98 Dialysis Machine Attentions B 75 Mute time 2 minutes ...