Gamatronic g-net 101010002U-SD Скачать руководство пользователя страница 14

G

AMATRONIC 

E

LECTRONIC 

I

NDUSTRIES 

L

TD

.

 

 

G-NET 19” UPS User Manual 

Automated computer shutdown 

8

 

 

5.

 

A

UTOMATED COMPUTER SHUTDOWN

 

A compact disk (CD ROM) is delivered along with the UPS. The disk contains software that can be 
installed on a computer. If that computer is connected to the UPS, then, the software can be used to 
perform an automatic, orderly shutdown of the computer in the event of an ac power outage. 

1. 

Connect one end of the supplied D9 – D9 cable to the rear panel of the UPS, and connect the other 

end to the computer. The D9 socket is shaped like this:

 

2. 

Insert the supplied compact disk into the computer. The installation program on the disk begins 
execution automatically. Follow the instructions on the computer screen to complete the installation 
of the software. 

3. 

Simulate an ac power failure and verify that the software automatically shuts down the computer 
after the specified time interval. 

 

If technical support is required, this can be obtained by contacting your dealer or authorized service 
representative. 

 

The diagram below shows the pin usage for the RS232-D9 socket. 

Table 4:  Pin usage on RS232-D9 socket 

Pin # 

Function 

I / O 

RS232 Rx 

Input 

RS232 Tx 

Output 

Ground 

 

 

 

Figure 7:  Pin usage on RS232-D9 socket 

Содержание g-net 101010002U-SD

Страница 1: ...gamatronic com G G N NE ET T 1 1 K KV VA A 2 2 K KV VA A 3 3 K KV VA A O ON NL LI IN NE E U UN NI IN NT TE ER RR RU UP PT TI IB BL LE E P PO OW WE ER R S SY YS ST TE EM M 1 19 9 r ra ac ck k m mo ou...

Страница 2: ...and for any damages that the Purchaser may claim for damage to any property or injury or death to any person arising out of its purchase or the use operation or maintenance of the subject product This...

Страница 3: ...TENANCE 9 7 SERVICE AND REPAIRS 9 8 TECHNICAL SPECIFICATIONS 10 LIST OF FIGURES Figure 1 Block diagram of system architecture 2 Figure 2 The UPS front panel 3 Figure 3 Rear panel of 1 kVA unit 4 Figur...

Страница 4: ...space between the ventilation openings of the UPS and other objects or walls The UPS must be well grounded to the building s grounding system with a conductor that has a current carrying capacity that...

Страница 5: ...o not move the UPS while it is operating Do not use the UPS outdoors Do not turn the UPS upside down during transportation Do not connect or disconnect the cable to the battery cabinet before the batt...

Страница 6: ...GAMATRONIC ELECTRONIC INDUSTRIES LTD G NET 19 UPS User Manual vi...

Страница 7: ...he model name is printed on the G Net s rear panel 1000 VA 2000 VA or 3000 VA If you are unpacking the G Net in a low temperature area some condensation may occur on the outside or inside of the UPS I...

Страница 8: ...nuously provides conditioned power to attached devices Under normal power conditions the UPS is constantly regulating and filtering out any fluctuations of the input voltage In the event of an electri...

Страница 9: ...d by the UPS Vac 2 Output voltage as measured by the UPS Vac 3 Output frequency as measured by the UPS Hz 4 Load level as a percentage of a full load 5 Remaining battery capacity as a percentage of a...

Страница 10: ...cy Power Off EPO button 7 Connection point for external battery 8 Fan grille 9 D9 connection for RS232 communication Figure 4 Rear panel of 2 kVA and 3 kVA models Table 3 Key to Figure 4 ITEM DESCRIPT...

Страница 11: ...GAMATRONIC ELECTRONIC INDUSTRIES LTD G NET 19 UPS User Manual System description 5 Figure 5 Backup time vs load representative...

Страница 12: ...rt on the G Net rear panel 4 The other end of the battery cable has three branches Connect the red branch of the battery cable to the plus terminal of the battery box Connect the black branch of the b...

Страница 13: ...tch OFF the G Net press the OFF button on the front panel for 2 or 3 seconds 3 3 3 Performing a battery test To test the UPS battery when the UPS and the load devices connected to it are operating do...

Страница 14: ...the computer The D9 socket is shaped like this 2 Insert the supplied compact disk into the computer The installation program on the disk begins execution automatically Follow the instructions on the c...

Страница 15: ...tee period Gamatronic bears no liability for damage caused to the UPS due to improper maintenance by third parties in particular after the expiration of the warrantee or service agreement It is the re...

Страница 16: ...load 6 Overload tolerance 105 130 moves to bypass after 30 sec over 130 moves to bypass after 200 ms Ratio max normal load crest ratio 3 1 Transfer times msec To from battery To from bypass typical m...

Страница 17: ...o Dc Converters Frequency Changers Battery Chargers Power Management Solutions Headquarters and Factory 17 Professor Hartum Street POB 45029 Jerusalem 9777517 Israel Gamatronic UK Ltd 15 Chester Road...

Отзывы: