background image

 GVO  1508

SLOPING ROOF SHED

1530mm wide x 780mm deep x 1830mm - 1770mm high

ASSEMBLY 

INSTRUCTIONS

YOU SHOULD HAVE ONE PACKAGE:

• 

1 cardboard package

TOOLS REQUIRED:

• 

Battery or electric drill

• 

3.3mm (1/8th inch) drill bit

• 

Screwdriver or riveter

• 

Tape measure

• 

Ladder

• 

Non-slip gloves, good 

  shoes and goggles

• 

A set of helping hands

CALL 0508 454 873

  

for an installer near you

Some parts have sharp edges and should  

be handled very carefully. We recommend  

the use of protective gloves and footwear  

when assembling. 
DO NOT attempt to erect this shed in windy 

weather. All dimensions are approximate.

PACKED BY:

Please quote this code for any 

correspondence back to the supplier

Содержание GVO 1508

Страница 1: ...iveter Tape measure Ladder Non slip gloves good shoes and goggles A set of helping hands CALL 0508 454 873 for an installer near you Some parts have sharp edges and should be handled very carefully We...

Страница 2: ...the code on the front page 1 x 1770 x 780mm door sheet 1 x narrow 1830 x 715mm sheet for front wall beside door 2 x 1830 1770mm sloping sheets side walls 1 left 1 right 2 x 1770mm U channels for door...

Страница 3: ...n the centre of the door sheet slipping it under the two side U channels and fixing it to the sheet ribs and the side U channels Attach the hinges N approx 150mm from the top and bottom of the door th...

Страница 4: ...ou use an 8mm shackle diameter padlock on these pad bolts anything smaller may create security issues ADDITIONAL INFORMATION Channels will come short of the ends of the sheeting by 10 15mm on all pane...

Страница 5: ...sheeting with the 1515mm U channels F Fix the channels at every second rib but not the corners at this stage Place the short flange of the first L flashing K on top of the rib at one end Make sure the...

Страница 6: ...m channel of the inside of the door and the sheet Do the same at the top overlapping in the centre behind the padbolt If you have a locking T handle you will have to run the Z s the opposite way to th...

Страница 7: ...l of the front and the back walls 10mm more than the overhang Fix beside every second rib You will not need to worry about these fixings leaking as any water seeping through these fixings will end up...

Страница 8: ...nt or act of God including weather b The warranty shall cease and the Supplier shall thereafter in no circumstances be liable under the terms of the warranty if the workmanship is repaired altered or...

Отзывы: