Version 2, 13 June 2017, Page
2
of
4
PRE-INSTALLATION -
MOUNTING DETAILS
− If the mounting holes do not already exist, mark out
and drill the hole in the bench/trough to suit your
requirements.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed
prior to drinking taps to eliminate any foreign material.
Ezy-Grip
Multi-Grip
INSTALLATION
INSTALLATION COMPLIANCE:
Galvin Specialised products must be installed in accordance with these
installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements.
Water and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Failing to comply with these provisions shall void the product warranty and may affect the performance of the
product.
IMPORTANT
: Whilst our product designs take into account a broad range of installation types and surfaces, it is
important that surfaces which fixtures are mounted to are flat and free from defect. This is especially important
when installing product ranges that have been designed for correctional and health facilities, where special
attention is required to minimise ligature points and areas for concealment of contraband. In addition to ensuring
the products are fitted securely and in accordance with the following instructions, consideration shall be given to
the use of non-pick mastics such as BASF Sonolastic “Ultra” to ensure a high quality and safe installation.
DRILL
33mm
1/2" CU/BSP
115
NOM
59
67
NOM
NOM
115
59
67
NOM
1/2" CU /BSP