background image

 

Version 2, 13 June 2017, Page 

2

 of 

4

 

PRE-INSTALLATION - 

MOUNTING DETAILS

 

−   If the mounting holes do not already exist, mark out  

and drill the hole in the bench/trough to suit your  
requirements.  

 

Note: Before installation, all lines must be flushed. 
We recommend that a line strainer be installed  
prior to drinking taps to eliminate any foreign material.

 

 

 

                                    Ezy-Grip 

 

 

                               Multi-Grip

 

 

INSTALLATION

 

INSTALLATION COMPLIANCE:

  Galvin Specialised products must be installed in accordance with these 

installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. 
Water and/or electrical supply conditions must also comply to the applicable national and/or state standards. 
Failing to comply with these provisions shall void the product warranty and may affect the performance of the 
product. 
 

IMPORTANT

:  Whilst our product designs take into account a broad range of installation types and surfaces, it is 

important that surfaces which fixtures are mounted to are flat and free from defect.  This is especially important 
when installing product ranges that have been designed for correctional and health facilities, where special 
attention is required to minimise ligature points and areas for concealment of contraband. In addition to ensuring 
the products are fitted securely and in accordance with the following instructions, consideration shall be given to 
the use of non-pick mastics such as BASF Sonolastic “Ultra” to ensure a high quality and safe installation.

 

DRILL

33mm

1/2" CU/BSP

115

NOM

59 

 

67

NOM

NOM

115

59 

 

67

NOM

1/2" CU /BSP

Отзывы: