Galvin Specialised Ezy-Drink TD00C-LM Скачать руководство пользователя страница 2

 

Version 2, 16 August 2017, Page 

2

 of 

4

 

PRE-INSTALLATION

 

MOUNTING DETAILS – HOLE CENTRES

 

 

If the mounting holes do not already 

exist, mark out and drill the holes in the 

bench/trough, as shown in rough-in 

dimensions. 

 

Ensure alignment of 5mm hole is 

as shown, as this will determine 

the direction of the water flow. 

 

Note: Before installation, all lines must 

be flushed.   We recommend that a line 

strainer be installed prior to drinking taps 

 to eliminate any foreign material.

 

 

 

 

INSTALLATION

 

IMPORTANT:

  Galvin  Specialised  products  must  be  installed  in  accordance  with  these  installation 

instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water 
and/or  electrical  supply  conditions  must  also  comply  to  the  applicable  national  and/or  state  standards. 
Failing to comply with these provisions shall void the product warranty and may affect the performance of 
the product. 

 

 

1. Fit tap assembly 

  Fit the outlet into the bench.  

  Ensure the rubber sealing washer is 

placed underneath the outlet body and 
the anti-rotation pin locates properly. 

 

Secure underneath with the supplied cup 
washer and back nut.

 

2. Flow adjust 

  To adjust water flow 

1.  Remove the blanking screw 

 

2.  Adjust the water height by turning the 

regulator screw 

 

3.  Replace blanking screw 

Note: The full range from minimum flow to maximum 

flow is only ¼ turn

 

139 

1/2" BSP

ANTI
-ROTATION
PIN

 91 

 59 

  50 

16.0

5.0

DRILL

23mm Min.

26mm Max.

Отзывы: