background image

 

13 

 

Version 1, 15 June 2020, 13 of 16 

12.0  

APPENDIX 

Galvin Engineering Thermostatic Mixing Valve or 
Tempering Valve Commissioning Report and/or 
Maintenance Report

 

Note: 

1.  

Please use a separate form for each valve. 

2. 

The original copy of the report is to be given to the owner/occupier and retained on site for a minimum of 7 years. 

Cross off appropriate box  

 

Thermostatic Mixing Valve 

 

 

Tempering Valve 

 

 

Commissioning Report   

 

 

Maintenance Report  

 

Name of Establishment:    ____________________________________________________________________  

Address of Establishment: ______________________________________________________________________ 

Phone Number: _____________________________ Date: _____________________  Work Order #:  _______  

Contact Person: _______________________  Make & Model of Hot Water System: ________________ ______ 

Temperature of Hot Water to the Valve: ____________ Temperature of Cold Water to the Valve: ______________ 

Hot Water Pressure: ________kPa Cold Water Pressure: _______kPa 

Make of Mixing Valve: _______________________ Model No: ________________________ Size:  _________  

Valve Location/Building:  _____________________________________________________________________  

Valve Identification No:  ______________________________________________________________________  

Total No of Valves on the Site/Building:  _________________________________________________________  

No of Outlets Serviced by this Valve: Baths (    )   Basins (    )  Showers (    ) 

Other Outlets - Details   ______________________________________________________________________  

Valves Installed to the requirements of:

 

The NSW Code of Practice Plumbing and Drainage 

Yes 

No 

The HOSPLAN Code of Practice for Thermostatic Mixing Valves in Health Care 
Facilities 

Yes 

No 

The Valves manufacturers requirements 

Yes 

No 

AS4032.3 

Yes 

No 

The specifications and drawings for the project 

Yes 

No 

The Local Water Supply or Authority 

Yes 

No 

 

If No, give details and actions taken: 
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
______________________________

 

Содержание CliniMix Lead Safe TMV SS

Страница 1: ...ng tempered water to the desired outlets This stainless steel hinged cabinet kit is a lockable cabinet with 20mm copper fittings 2 in and 1 out which allows secure installation and safe simple mainten...

Страница 2: ...es 3 0 DESCRIPTION This manual covers the CliniMix Lead SafeTM TMV SS Cabinet Assembly with Universal Door 20 Bottom In Out These are designed to provide tempered water to the desired outlets This mix...

Страница 3: ...APH The Galvin Engineering CliniMix Thermostatic Mixing Valve is suitable for many applications The Head loss Characteristic for Mixed Outlet Flow rate versus Balanced Inlet Pressure is shown below in...

Страница 4: ...ction within specification on unequal pressures up to 6 1 The mixer has integral isolating valves which permit servicing of the strainer check valve flow regulator and thermostatic cartridge They are...

Страница 5: ...ure to do this may void the warranty 3 Connect water lines Before connecting to water lines all lines must be flushed Remove protective vinyl cap from copper tubes Join each copper tube to the correct...

Страница 6: ...rtest length of pipe work between the mixing valve and outlet fixture Allow the mixed outlet to flow for at least 60 seconds to allow the temperature to stabilise before taking a temperature reading a...

Страница 7: ...Restore the cold water to the TMV After the mixed water temperature has stabilized note the outlet temperature ensuring the outlet temperature has reestablished Now repeat the above test except this t...

Страница 8: ...st plugs in the top of the inlet fittings are tight and that there is no evidence of water leakage The TMV must then be recommissioned as per Section 7 0 including temperature adjustment and the shutd...

Страница 9: ...rass top assembly screw out the plastic spindle and replace the smaller O ring 5 Carefully remove the spindle from the center of the body 6 Remove O ring from spindle Replace with O ring supplied in t...

Страница 10: ...OR WM TMV1 1 2 WM ISO 1 INLET ISOLATOR ELBOWS PAIR FOR WM TMV1 1 3 WM NRV 1 INLET NON RETURN VALVE FOR WM TMV1 PAIR 1 4 WM STR 1 INLET STRAINERS FOR WM TMV1 PAIR 1 5 WM TPKIT 1 THERMOSTAT PISTON SHUTT...

Страница 11: ...r s recommendation the ode and all relevant statutory and local tate or erritory requirements 4 The TMV must be returned to Galvin Engineering together with a fully and correctly completed Galvin Engi...

Страница 12: ...ntrol valves to ensure inlet conditions are within range Clean strainers ensuring debris is removed Either full hot or cold flowing from the outlet fixture Valve is incorrectly set Hot Cold water has...

Страница 13: ...___________________ Model No ________________________ Size _________ Valve Location Building _____________________________________________________________________ Valve Identification No _____________...

Страница 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Страница 15: ...Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design flow rate for the mixing valve Note An accura...

Страница 16: ...e ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________________________________ Previous Service carried out...

Отзывы: