background image

 

 

Version 1, 31 October 2019, Page 

4

 of 

5

 

 

 

Figure 3 

Clevakit typical installation 

Conforming to AS1428.1-2009

 

5. Check Shower for operation and leaks 

Check the hose is securely connected. Turn on 
water supply, the shower should now be 
working. Once installation is completed and the 
unit must be tested for any leaks. 
 

Notes: 

1.  To comply with backflow prevention 

standards, the hand spray must hang at 
least 

55mm above the floor provide an ‘air-

gap’ (See Figure 1 and 2). If the hand piece 
lies on the floor, then an appropriate 
backflow prevention device must be 
installed.

 

2.  Figure 3 shows a Clevakit typical installation 

conforming to AS1428.1-2009.

 

 

Отзывы: