Galaxy GHDX2-2430S/R-24F4D Installation and Hardware Reference Manual
4-26
Subsystem Connection and Operation
4.5.4 LCD
Screen
When powering on the subsystem, the following messages should appear on the
front panel LCD screen. Wait for the front panel LCD to show “
READY
” or
“
No Host LUN
” before the host boots up.
Figure 4-14: The LCD Initial Screen
The LCD screen startup sequence is shown and described in the sequence
below.
This screen appears when the PSUs are
turned on.
System is performing a self test.
System power-on self test is completed.
System is accessing various interfaces.
Verifying installed memory.
System is ready. You can now start to
configure the subsystem.
System is ready for I/Os.
GHDX2-24
Ready
Model Name
Status/Data Transfer Indicator
Initializing….
Please Wait...
Power On Self
Test Please Wait…
Power on
Init Completed..
GHDX2-24
GHDX2-24
512MB RAM, Wait...
GHDX2-24
No Host LUN
GHDX2-24
Ready
Содержание GHDX2-2430R-24F4D
Страница 15: ...Galaxy Raid Installation and Hardware Reference Manual xv ...
Страница 32: ...Chapter 1 Introduction 1 17 This page is intentionally left blank ...
Страница 61: ...Chapter 3 Subsystem Monitoring System Monitoring 3 5 Figure 3 3 LCD Panel LEDs ...
Страница 87: ...Galaxy GHDX2 2430S R 24F4D Installation and Hardware Reference Manual 4 20 Subsystem Connection and Operation ...
Страница 97: ...Galaxy GHDX2 2430S R 24F4D Installation and Hardware Reference Manual 5 2 Subsystem Maintenance ...
Страница 112: ...Chapter 5 Subsystem Maintenance Subsystem Maintenance 5 17 This page is intentionally left blank ...
Страница 119: ...Appendix A Subsystem Specifications Specifications A 7 This page is intentionally left blank ...
Страница 122: ...Appendix B Spare Parts and Accessories Spare Parts and Accessories B 3 This page is intentionally left blank ...
Страница 127: ...Appendix C Pinouts Pinouts C 5 Figure C 4 Connector Pinouts Adapter Cable for COM2 ...