8
Instructions for Roof Assembly (Purchased Separately)
X
S
U
V
W
AB20008A_G4
AB20008A_G5
P
Q
R
S
T
Figure 9
The following steps 1 through 3 are to assemble and attach the Gaggle Roof Accessory
4163157 available from your Foundations authorized dealer.
Roof Assembly Step 1
To remove filler panels (X) Located in 4
places:
Pry off Cap Nut (S) with a straight blade
screw driver and discard.
Using Allen Wrench (T) remove Shoulder
Screw (U), Cap Nut Washer (V) and Plain
Washer (W).
Keep hardware (U,V,W) for re-assembly.
Pull up on 4 filler panels (X) and remove.
Filler panels must be kept for future use if
roof is not used.
See Figure10
Roof assembly:
Slide Roof Front (P) and Roof Rear (R) onto
Roof center (Q).
See Figure 9
Caution, when assembling the Roof use
caution that the center is facing up so that
clear panel does not get scratched on floor.
Part Description Part # QTY
P. Roof Front 42300025 1
Q. Roof Center 42300024 1
R. Roof Rear 42300023 1
S. Cap Nut 11300070 4
T. Allen Wrench 3/16” 11200363 1
Roof Assembly Step 2
Figure10