16
Installation of the extractor hood:
1.
Using the drilling template mark the position of
the screws on the ceiling.
2.
Drill 4 holes Ø 8 mm for the wall plugs. Push the
plugs flush with the ceiling (Fig. 19).
3.
T
urn two screws to a 10 mm gap. Both screws
are placed in a position, in which at a later stage
of the installation the key-holes of the supporting
frame are found (namely back left and front
right from the control panel of the hood).
4.
Adjust the support frame to the desired height
and secure with 8 screws (12 screws for the
longer ventilation ducts). The length of the
support frame can be adjusted in steps of
20 mm (Fig. 20).
Note:
this hood has been approved for installations as
low as 30 ´ ´ and as high as 36 ´ ´ above the
cooktop.
Circulating air mode only
:
there are four
brackets, which fix the circulating air switch module
to the top of the support frame. These should be
bent outward in a 90° angle (Fig. 21).
10
5
/
8
"
13
5
/
8
"
Fig. 19
Fig. 20
Fig. 21
Note:
the extractor hood is to be installed to a kitchen
ceiling or suspended ceiling. Ensure that the
ceiling is capable of providing a firm hold for a
maximum weight of hood and accessories of 45 kg.
Before marking the securing holes, make sure that
no electricity wires or water pipes or other wires/
pipes are laid at the drilling points in the ceiling.
Before installation check the enclosed wall plugs
and screws are suitable for your ceiling. If
necessary use special wall plugs.
Circulating air mode only