INSTALLATION GENERAL NOTES:

•   The roofing membrane must extend to  

the top of the nailer.

•   CMF expansion joint nailers must be 

mechanically attached 8" (203 mm)  

on center.

•   Wide curbs must be sloped or canted  

to prevent standing water.

•   All joints and patches are to be done using 

Metalastic

 materials only.

•   Flanges must be sealed to roof membrane 

with Metalastic

 Tape Sealant.

•   All surfaces being sealed with Splice Lock 

or receiving Metalastic

 Tape Sealant 

must be clean and dry. A hot air blower 

can be used to dry surfaces.

Safety Warning

•  Wear safety glasses

 when nailing or 

using adhesives to prevent eye injuries.

•  Wear protective gloves

 when working 

with adhesives.

•  Read cautions on labels

 of adhesive and 

sealant containers. Improper care or use 

can cause serious injury.

Installation Procedures:

A.

  Unroll the CMF on top or along side 

of the curb where it is to be installed, 

foam side down. Then position on top 

of the curb. Fold an outside nailer back 

and align the first inside metal nailer  

on top of the curb with the foam along 

the opening. Nail in place 8" (203 mm) 

on center. 

B.

  Fold the opposite side nailer back 

and position the second inside  

nailer on top of the second curb.  

Nail in place. 

C

.  Fold the flexible flanges down the 

curb face and mark where they end.  

Fold the flexible flange back and 

apply the Metalastic

 Tape Sealant 

to the vertical surface just above the 

mark. Fold the outside nailers down 

in place. Nail  8" (203 mm) on center. 

An ASTM D4586 Type II plastic 

asphalt cement compatible with the 

roofing membrane may be used in 

place of Metalastic

 Tape Sealant.