2.
- O
tha
- T
fur
.- INSTRU
Open the carton
at it is the correc
To obtain optimu
rniture, curtains
MODELS
MODULES
W (cm)
D (cm)
H (cm)
WEIGHT (k
VOLTAGE
INPUT (W)
CTIONS O
n at the indicate
ct model and th
um performance
etc. See figure
- The studs and
- Hung the unit
- By turning the
Position
and ha
Use the
floor.
RX4
RX4
RX4
4
41
g)
9,
50
ON INSTAL
ed side. The scr
at it is in good c
es it is necessar
.
o
minimum15cm
d screws are in
on the hooks o
e screw the met
n and fix the bra
ng the unit on th
e polystyrene pa
X4P
X4F
X4E
RX6
RX6
RX6
4
6
.5 57.5
5 13,5
00 750
LLATION
rews are in the
condition.
ry to maintain a
mínimu
Closest
object to the
left end
m
the accessories
of the brackets.
allic square will
ackets at the co
he hooks of the
ackaging to leve
10
P
6F
E
RX8P
RX8F
RX8E
8
5 73.5
10 + 2 cm se
5 17,5
2
0 1000
accessories ba
minimum clear
s
um 10cm
s bag.
go downwards
orrect distance fr
brackets. And m
el the heater an
P
F
E
RX10P
RX10F
RX10E
10
89.5
eparated from th
58
21,5
20-240V~
1250
ag. Turn the car
rance of 15 cm
shelf
, retaining the h
rom the floor
mark the wall.
d protect the
RX12P
RX12F
RX12E
12
105.5
he wall
25,5
1500
rton upside dow
between the rad
mínimum 15cm
heater. Repeat t
RX14P
RX14F
RX14E
14
121.5
29,5
2000
wn to allow the
diator and any i
m
mínimum 25cm
this on the other
Use the
and mar
the wall
the two f
square b
heater to stand
nflammable ma
Closest
object to the
right end
m
r bracket.
heater as a tem
k the fixing poin
using a pencil th
fixing holes in th
brackets.
d. Check
aterial as
mplate
nts on
hrough
he
Содержание RX10E
Страница 10: ...25 NOTAS NOTE NOTAS...