Global-Tek (Singapore) Pte Ltd
Page
4
INSTALLATION
Before installation, please see the specification tag placed on the right hand side of the machine,
make sure to verify the electrical power supply. Right after the packing is opened, please examine
the machine immediately for any damage caused during transportation. If any, please keep all the
packing materials, and inform the supplier within 3 days.
Select the right place for installation
It is important to put the dishwasher at the right place for installation. Before to decide a proper
position, please consider the connection of power supply, water supply, drainage, gas heater (if
needed), S.S. working tables and detergent dispenser (to be provided), as long as the required space
for daily maintenance and ceiling height for opening machine door. (See diagram 1)
Diagram 1
The machine must be horizontally placed for all electrical and water connections. To reach the
desired height level and maintain balance, turn the adjustable foot accordingly.
Power connection
a
Warning: All connection of electricity and grounding must comply with any applicable
ordinance of the national or local electrical law.
a
Warning: Shut off power supply, hoist caution sign nearby, to alert anyone
NOT
to power on.
Please read carefully the electrical wiring diagram as shown on the machine case,
properly connect power cables with the designated terminals.
Содержание GT-U1M
Страница 13: ...Global Tek Singapore Pte Ltd Page 13 ...
Страница 14: ...Global Tek Singapore Pte Ltd Page 14 ...
Страница 15: ...Global Tek Singapore Pte Ltd Page 15 ...
Страница 16: ...Global Tek Singapore Pte Ltd Page 16 ...