![FY-TECH KRS-505 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/fy-tech/krs-505/krs-505_instruction-manual_2352934010.webp)
7
.
Installation
1.The indicator lights after
inserting the battery into the
base of the equipment; if
not, it runs out of battery.
2. Choose required die head
and install it into the slog.
Use wrench to tighten up.
2
3. Install the front die head
and tighten it up by wrench.
4. Installation is finished.
5. Put on the rivets.
6. Start operation.
09