Page 6
3. INSTALLATION
3.4 Selecting a Location
1. Select a correct location to place the unit.
2. Determine input power cord length according to its actual operation
requirement. Input power cord must have a minimum inside diameter of 6mm2.
3. Do not move or operate unit where it could tip.
4. Use cart or unit handle to move unit. Do not pull the cords to move unit.
5. Moving gas cylinder and main unit to hight sparaely.Use lifting eye to lift unit
only, not running gear, gas cylinders, or any other accessories.
6. Optional order for individual wire feeder is available. The wire fe eder and
welding gun divide from the main unit.It is more convenient to operate.