
FLATLINE VAN CO • [email protected] • 888-667-5576
LET’S GET STARTED!
1.
FIRST STEP IS TO GET THE BED RAILS UP. HAVING A SECOND SET OF HANDS
MAKES THIS MUCH EASIER. POSITION THEM WHERE YOU WANT THEM, AND
DRILL A FEW PILOT HOLES TO PUT SCREWS INTO.
NOTE-
THE DIY BED HAS A VAST RANGE OF HEIGHT ADJUSTMENT,
WE RECOMMEND MOUNTING IT BETWEEN 25”-41” HIGH WHEN
MEASURED FROM THE FLOOR OF THE VAN.
2.
PUT A COUPLE SCREWS IN (OR RIVNUT AND BOLT) TO HOLD THE RAIL UP
WHILE YOU SELECT AND DRILL FOR YOUR ADDITIONAL MOUNTING HOLES.
NOTE-
OPTIMAL MOUNTING LOCATIONS WILL VARY DEPENDING
HOW HIGH YOU MOUNT THE RAILS.
4
MOUNT HOLES
MEASURE TO THIS EDGE