Original-Bedienungsanleitung FUXTEC FX-AF1196_de_en_fr_ita_rev02
60
7.6.4 Adjusting the belt tension
1
Bracket
2
Forward cable
3
Reverse cable
4
Upper lock nut
5
Lower lock nut
Proper belt tension is critical for good work performance. After half an hour
of operation, all belts may need adjustment due to initial stretch. After that,
you should check the tension after every 2 hours of operation.
To increase the belt tension:
•
Loosen the upper jam nut and unscrew the nut.
•
Tighten the lower lock nut.
•
Check the adjustment.
This process can be repeated until the tube
adjustment screws are fully adjusted. If no further adjustments can be
made, the belt must be replaced.
Содержание FX-AF1196
Страница 1: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 1...
Страница 11: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 11 Warnhinweise Hilfestellungen Tabelle 1...
Страница 13: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 13...
Страница 14: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 14...
Страница 44: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 44 Warnings Assistances Table 1...
Страница 113: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 113 Avvertenze Tabella 1...
Страница 137: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 137...