![Future light 51841382 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/future-light/51841382/51841382_user-manual_2352114020.webp)
00050064.DOC, Version 1.1
20/27
(6)
DMX-Out socket
(7)
DMX-In socket
(8)
Power output
(9)
Power input
(10)
Control Board
(11)
Display
(12)
Esc-button
(13)
Up-button
(14)
Down -button
(15)
Enter-button
(16)
Safety eyelet
INSTALLATION
Rigging
The device can be placed directly on the stage floor or rigged in any orientation on a truss without altering its
operation characteristics.
Overhead rigging
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.