background image

In

st

all

at

io

n

IR

 C

on

tro

l

Page 16 of 20 // email [email protected]  tel: +44 (0) 1438 833577  fax: +44 (0) 1438 833565

MLI - Inverted Heavy Duty Lift Mechanism 

Operation Details

DC1

Low voltage power output for
motor drive.LED’s to show
operation of limit switches
and positional counters

Mains Voltage Input

IR LED

IR Input Jack

RS232

Contact Closure

SLQV

RS232

- Use an RJ25 connector
in the socket marked
RS232 on the control box
to operate using RS232

Details

Baud rate:  9600
Stop bit: 

1

Parity: 

None

Databits: 

8

Pin 1: RX

Pin 6 : TX

Pin 3 & 4: GROUND

Pin 2: TX

Pin 3: RX

Pin 5: GROUND

IMPORTANT

Ensure protocol is entered exactly as written,
including Carriage Return (Enter / ASCII 13).

RJ25

9 PIN D

PIN 1: RX

TO

PIN 2: TX

PIN 6: TX

TO

PIN 3: RX

PIN 3: GROUND

TO

PIN 5: GROUND

PIN 4: GROUND

TO

PIN 5: GROUND

Protocol

Action

fa_in Carriage Return (Enter        )

Device IN

fa_out Carriage Return (Enter        )

Device OUT

fa_stop Carriage Return (Enter        )

Device STOP (At any position)

Содержание MLI

Страница 1: ...tyLiftMechanism Design Highlights Unique Lift and Roll Flap Mechanism Hand Made Quality Construction Full Cable Management Custom Sized to Suit Exact Size of Screen Range of Add On Functions Available...

Страница 2: ...can result in serious personal injury or damage to equipment Future Sound Vision trading as Future Automation intend to make this and all documentation as accurate as possible However Future Automati...

Страница 3: ...ism 6 Stage 3 Fixing the Lift to the Cabinet 7 Stage 4 Adjusting the Down Stop Position 8 Stage 5 Positioning the Cover Infill Panel 9 Stage 6 Adjusting the Flap Down Position 10 Stage 7 Adjusting the...

Страница 4: ...or otherwise or service modification by persons not authorised by Future Automation or the use of any non Future Automation supplied parts Any electrical or other environmental work external to your...

Страница 5: ...2 3 1 4 Nuts Bolts Multipack A range of nuts bolts washers and spacers to help add in the mounting for your screen Package Contents 1 Mechanism 1 1 Flap 1 2 Screen Mount 1 3 Cable Management 1 4 Lift...

Страница 6: ...ly remove all the red cable ties which keep the mechanism safe and secure during transit There are usually 6 ties in the locations circled on the image However on some models there may be more than 6...

Страница 7: ...Try to use as many self adhesive pads as possible to get the most secure fixture 4 holes to be drilled in base panel These holes should be12mm diameter to allow for adjustment later Use frame as a te...

Страница 8: ...he 8 pointed screws supplied 4 on each side to pin the mechanism in place fixing its position left and right These 8 screws should be screwed through the middle hole of each of the clusters of 3 shown...

Страница 9: ...77 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism Adjusting the Down Stop Position By adjusting the screw up or down you can adjust the stop drop height of the lifting beam and also the cover...

Страница 10: ...Infill Panel Loosen off the frame and move the base to the centre of the opening There should be a gap of about 3mm around the edges of the base panel to the cabinet You will also have to cut a hole i...

Страница 11: ...he flap CABINET BASE PLAN VIEW By loosening the M6 bolts on each side under the flap you can adjust the position of the flap in the cabinet top Aim for a 3mm gap all round CABINET BASE SIDE VIEW By wi...

Страница 12: ...833577 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism By adjusting the bolts above each flap arm it is possible to alter the angle the flap opens to It is very important that when the flap is...

Страница 13: ...a Group A or C framework or a VESA 200 mount Check that the type supplied suits the screen that is going to be mounted to the mechanism Group A or C Framework Remove the uprights and fix them to the b...

Страница 14: ...slots in the side The inner uprights will slide to allocate different mounting systems When the screen is in position the cables can be connected and run up into the cabinet Pass the cables through t...

Страница 15: ...o allow the straps to bed in and stabilise It may then be necessary to re adjust the height and or level of the lifting beam as first discussed in Stage 4 of these instructions Fix the IR Sensor and R...

Страница 16: ...ators 568A 568B 1 12V SUPPLY 12V SUPPLY CURRENT LIMITED W G W O 2 12V LATCH When 12V attached device will go OUT When 12V removed device will go IN G O 3 GROUND GROUND W O W G 4 PIN 4 NOT USED BL BL 5...

Страница 17: ...connector in the socket marked RS232 on the control box to operate using RS232 Details Baud rate 9600 Stop bit 1 Parity None Databits 8 Pin 1 RX Pin 6 TX Pin 3 4 GROUND Pin 2 TX Pin 3 RX Pin 5 GROUND...

Страница 18: ...ler needs x2 AAA batteries which are provided within the packaging Replacing batteries Out Brings the mechanism out of the cabinet facing forward In Brings the mechanism inside the cabinet Stop Will s...

Страница 19: ...ftMechanism Inverted Heavy Duty Lift Mechanism Trouble shooting guide Lift Mechanism MLI Trouble shooting For information on our products please refer to our web site www futureautomation co uk or for...

Страница 20: ...0Kg 110 2lb Standard Screen Mount Colour Black Width N A Height N A Depth 155mm 6 1 Control IR Remote RF Remote Contact Closure RS232 Power Supply 240V or 110V Control Of 3rd Party Product Yes Output...

Страница 21: ...Page 20 of 20 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism Notes...

Страница 22: ...e Automation Unit 2 Kimpton Enterprise Park Claggy Road Kimpton Hertfordshire SG4 8HP United Kingdom Tel 44 0 1438 833 577 Fax 44 0 1438 833 565 Email info futureautomation co uk www futureautomation...

Отзывы: