Schematic Diagram
Operation
For First Time Use:
STEP 1:
Fully charge the battery before first use.
Charge under direct sunlight in the <OFF>
position for 2 days.
STEP 2:
Locate the ON/OFF switch on the outer
perimeter of the solar housing (Figure 3).
STEP 3:
For daily operation, place the ON/OFF switch in
the <ON> position. Your solar light will
automatically turn on once it gets dark.
Assembly & Installation
You have the option for each lamp post to assemble as per
Figure 1 (standard), or Figure 2 (hanging lantern).
Installation (Standard)
STEP 1:
Select a suitable location to install and secure
the lamp post base (Figure 4).
STEP 2:
Press pole section (C) onto base (F) until
secure.
STEP 3:
Press pole adapter (D) into pole (C) until
secure.
STEP 4:
Press pole section (C) onto pole adapter (D) until secure.
STEP 5:
Press center pole adapter (E) into pole (C) until secure.
STEP 6:
Repeat step 4 until desired height is achieved.
STEP 7:
Press lantern head assembly (A & B) onto top pole section until
secure.
2
3
Figure 1
Standard
Figure 2
Hanging
A
SOLAR HOUSING
Figure 3
11
Figure 4
11
B
LANTERN HEAD
C
POLE
D
POLE
ADAPTER
C
POLE
E
CENTER POLE ADAPTER
F
BASE
C
POLE
D
POLE ADAPTER
C
POLE
B
LANTERN
HEAD
ASSEMBLY
H
LANTERN
HEAD
PLUG
G
HANGING
BRACKET
C
POLE
D
POLE
ADAPTER
C
POLE
E
CENTER
POLE
ADAPTER
C
POLE
D
POLE
ADAPTER
C
POLE
F
BASE