10. INSTALLATION
10-20
Grounding
To prevent electrical shock and mutual interference, run a ground wire between
the earth terminal on the unit and ship’s superstructure.
Cabling schedules
The signal cable should be a twisted-pair, double-screened cable. Ground the
signal cable at the cable clamp.
Connections
Power supply
J1 (24 VDC)
Pin no.
Designation
#1 +
#2 -
Input signal (NMEA)
The signal from GPS navigator is connected to J2 and J3. Data being fed to J2
has higher priority than J3.
J2 J3
Pin no.
Designation
Pin no.
Designation
#3
RD1-H #3 RD2-H
#4
RD1-C #4 RD2-C
#6
GND #6 GND
Output signal (RS-422 or NMEA)
J4, J5, J6, J7, J8, J9
Pin no.
RS-422
NMEA
#1 TD-B TD-H
#2 TD-A TD-C
#4* GND GND
*#5 for J9
Содержание GP-150-Dual
Страница 1: ...Dual GPS GP 150 DUAL OPERATOR S MANUAL www furuno co jp MODEL ...
Страница 28: ...3 MARKS 3 4 This page is intentionally left blank ...
Страница 36: ...4 NAVIGATION PLANNING 4 8 This page is intentionally left blank ...
Страница 66: ...8 MENU SETTINGS 8 14 This page is intentionally left blank ...
Страница 98: ...APPENDEX AP 4 World Time Standards ...
Страница 117: ...D 1 ...
Страница 118: ...D 2 ...
Страница 119: ...D 3 ...
Страница 120: ...Y Hatai hatai 2005 12 19 11 57 12 09 00 Dー4 ...
Страница 121: ...Mar 27 07 R Esumi D 5 ...
Страница 122: ...Feb 19 03 D 6 ...
Страница 123: ...Feb 19 03 D 7 ...
Страница 124: ...D 8 ...
Страница 125: ...Jan 13 04 D 9 ...