2
Installation Site
Fix the transducer to the mounting mast so that its mounting base is parallel with the water
line. Also, position the transducer so its leading edge faces the bow.
Mounting Procedure
1. Orient the mounting base as shown figure below, with the threaded part of the mount-
ing base facing the bow. Fix the mounting base to the mast with four self-tapping
screws (
×20, supplied).
2. Pass the connector on the transducer through the hole in the mounting base and the
screw the cap on the transducer into the mounting base.
3. Set the lock fitting to holes on the both sides of the mounting base and push the lock
fitting onto the shaft until you hear click as shown figure below.
4. Mate the connector at the rear of the transducer to cable assy. FI-50-SENSOR-30/50
(30 m or 50 m, supplied).
80
7.5
55 ± 0.5
50
40±0.5
Ø5
(TOP VIEW)
(SIDE VIEW)
Self-tapping Screw
(Ø4×20, 4 pcs)
(BOW)
Lock fitting
Set
Lock fitting
Shaft
Cap
Mounting
base
Wind
Transducer
Top view: Mounting base
Cable assy.
FI-50-SENSOR-30/50
Содержание FI-5001
Страница 5: ...9 Dec 08 R Esumi ...