10-26-2017
Page 2/4
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
STEP 3: Lay footboard back down on a padded, clean surface. Attach bun feet to footboard. Turn
footboard right side up.
Leveler
Bun Foot
b
a
Wood Screw
Slat bearer
Side Rail
HB Backside
Left Leg
Right Leg
STEP 1: Lay the headboard face down on a
soft surface. Attach the left leg and right leg
to headboard by using 6 bolts(A), lock
washers(B) and flat washers(C).
STEP 2: Attach the wood stretcher to the
legs by using 2 bolts(A), lock washers(B)
and flat washers(C).
HB Backside
Wood Stretcher
A
B
C
D
STEP 4: The slat bearers have been attached in position b. The slat bearers can be moved into
position a depending on the mattress/platform configuration. Remove the bolts and screws from
the slat bearers and side rails as shown below. Then re-attach the slat bearers to the side rails in
desired position with bolts, lock washers, flat washers, and screws.
Caution: Do not over tighten
bolts as this may loosen the threaded inserts in the side rails.
ITEM NO: ICB-400-BCH/BLK/EGG/GRY-KD-1 Queen Sleigh Bed HB
ICB-402L-BCH/BLK/EGG/GRY-1 Queen Side Rails
ICB-401-BCH/BLK/EGG/GRY-1 Queen Sleigh Bed FB
A
B
C
D