1) Prepare 4 bolts assembly by inserting washer (#D) onto bolts
(#A). Align bottom shelf (#5) to the holes of the frames (#2,3).
Secure by using bolts (#A).
2) Prepare 2 bolts assembly by inserting washer (#E) onto bolts
(#B). Secure bottom shelf (#5) by using bolts (#B).
Align front (#1) to the
holes of the whole
frame. Secure side
holes by using bolts
(#A) with washer (#D).
Align front (#1) to the
holes of the whole frame.
Secure top holes by using
bolts (#B) with washer
(#D).
Содержание CM5011-PCL
Страница 1: ...Rev 17 11 20 For more information contact our team service ec foagroup com...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 11: ...Align cabinet brackets I to each other then secure with plastic strap Adjust leveler according to ground level...