Align the vertical guard rail support (#6), then insert
the bolts (#F). Secure using the Allen wrench (#O).
Insert the nuts (#G) into the
holes along the sides of (#7,8).
Make sure the openings face
the holes. Make sure to insert
the dowels (#A) into the ends.
Insert bolts (#C)
into this end
and secure.
Insert bolts (#B)
into this end
and secure.