Furman CONTRACTOR Series Скачать руководство пользователя страница 5

The  CN-3600SE  is  readily  adaptable  to  a  wide 

range of installation requests and requirements. 

It was designed from the ground up to be com-

patible  with  Furman  legacy  and  third  party 

equipment. Forced Off inputs and selectable DIP 

switch settings are provided to allow easy inter-

face to devices, such as alarm systems.

Additional Features

The  CN-3600SE  is  equipped  with  LED  indica-

tors to provide visual aid in tracking conditions 

such  as  power,  protection,  sequencing  and 

communication. The CN-3600SE is supplied by 

a  1.5mm^2 AWG,  2.5  meter AC  cord. All  Con-

tractor Series units are backed by our 15 year 

Limited Warranty 

Important Safety Instructions

1.

 Please read and follow all instructions.

2.

 Please keep these instructions.

3.

 Please heed all warnings.

4. WARNING:

 This device is intended for indoor 

use only. Do not use this device in or near water. 

To reduce the risk of fire or electric shock, do not 

expose this device to rain or moisture.

5. CAUTION:

 Always On receptacles are present, 

providing constant AC power. To reduce risk of 

shock,  please  disconnect  the  CN-3600SE  from 

AC power before servicing any equipment con-

nected to the CN-3600SE Sequencer.

6.

 Clean only with dry cloth.

7. CAUTION:

 Do not install near any heat sources 

such as radiators, heat registers, stoves, or other 

equipment that may produce heat.

8.

 Protect the power cord from being walked on 

or  pinched,  particularly  at  plugs,  convenience 

receptacles,  and  the  point  where  they  exit  the 

device.

9.  WARNING:

  The  DE-9  RS-232  communica-

tions port provides power for Furman accesso-

ries  (e.g.  BB-RS232).  Please  verify  pin  assign-

ment and protocol before connecting any other 

manufacturer’s device to this port.

10.

 Please, only use accessories specified by the 

manufacturer.

11.

  Refer  all  servicing  to  qualified  personnel. 

Servicing  is  required  when  the  unit  has  been 

damaged in anyway or fails to operate.

12.  WARNING:

  Do  not  use  power  cord  as  the 

main power disconnect. The device is intended 

for AC power sequencing.

13.

  Do  not  defeat  the  safety  purpose  of  the 

Schuko  plug. A  Schuko  plug  has  two  pins  and 

a grounding contact or receptacle. If the Schuko 

plug does not fit into your outlet, please consult 

an electrician for assistance.

14.

  This  device  is  supplied  with  a  detachable 

IEC-C19  to  CEE-7/7  Schuko  power  cord.  Any 

prospective replacement cord must comply with 

the minimum ratings of the line cord originally 

supplied with this device and be HAR Certified 

for  use  in  the  country  in  which  the  unit  is  de-

ployed.

15. WARNING: 

This device must be connected 

to  an AC  outlet  with  a  protective  earth  ground 

connection.

www.furmancontractor.com     •    877-486-4738

4

 Security and Safety

 SmartSequencing™ 101

SmartSequencing™ technology provides a very 

simple means of connecting together a group of 

Furman Contractor devices to form a network or 

“chain” of sequencers. SmartSequencing™ al-

lows all devices within a chain to be controlled 

and  queried  from  a  single  Primary  sequencer. 

One of the defining characteristics of SmartSe-

quencing™ technology is its ability to allow any-

one to quickly achieve professional results.

SmartSequencing Hierarchy:

In a SmartSequencing™ network, there can only 

be  one  Primary  unit.  Secondary  units  respond 

to  the  commands  from  the  Primary.  The  Pri-

mary unit manages the communications within 

the  SmartSequencing™  chain.  (This  includes 

principal  communication  between  the  chain  of 

sequencers  and  the  outside  world,  e.g.  Blue-

BOLT®).  Secondary  units  relay  messages  and/

or  execute  commands  and  queries  that  have 

been  routed  to  them  by  the  Primary  unit.  The 

CN-3600SE can serve as a Primary or Second-

ary sequencer depending on the setting of DIP 

Switch #8 – more on this later.

SmartSequencing Communications:

A  Furman  SmartSequencing™  chain  commu-

nicates  using  a  bucket  brigade  technique.  A 

Primary  sequencer  communicates  to  the  first 

downstream  Secondary  sequencer  by  sending 

commands out of its Primary (P) OUT terminals 

to  the  Secondary  (S)  IN  terminals  of  the  next 

downstream Secondary sequencer. If there are 

additional  Secondary  sequencers  within  the 

chain, the first Secondary sequencer will com-

municate  to  the  next  downstream  Secondary 

sequencer  using  its  Primary  (P)  OUT  terminals 

to the second Secondary (S) Unit’s Secondary IN 

terminals. This  continues  down  the  chain  until 

the last Secondary sequencer has received the 

message.  The  last  Secondary  sequencer  will 

receive  commands  into  its  Secondary  (S)  IN 

terminal port but will not forward the message 

because there are no more units downstream.

Forming a chain of sequencers:

Create a SmartSequencing chain by linking the 

Primary (P) OUT terminals of the Primary to the 

Secondary (S) IN terminals of the first Second-

ary sequencer. To add more sequencers, simply 

connect

connect  this  first  upstream  Secondary  Primary 

OUT  (P)  terminals  to  the  Secondary  (S)  IN  ter-

minals of the next Secondary sequencer down-

stream. This pattern continues until all sequenc-

ers have been linked together as is shown in the 

figure below. 

Example of SmartLink connections

SmartSequencing  is  polarity  independent,  so  it 

does not matter which OUT (P) terminal is con-

nected  to  the  IN  (S)  terminals  on  the  next  se-

quencer. All that matters is that the connections 

proceed in the order in which you would like your 

chain of sequencers to activate.

COMM/

POWER

+12V

STAT

REM

GND

P
P
S
S

OUT

IN

SmartSequencing

REMOTE PORT

PRIMARY

P
P
S
S

OUT

IN

PRIMARY UNIT

P
P
S
S

OUT

IN

SECONDARY

SECONDARY

P
P
S
S

SmartSequencing

PRIMARY 

(OUT)

SECONDARY

SECONDARY UNIT

P
P
S
S

PRIMARY 

(OUT)

SECONDARY 

(IN)

SECONDARY UNIT

P
P
S
S

PRIMARY

SECONDARY 

(IN)

Содержание CONTRACTOR Series

Страница 1: ... For additional information refer to the Quick Start Guide included with product packaging www furmancontractor com 16 A Maximum For more information call Para más información llame al Pour plus de renseignements 877 486 4738 CONTRACTOR SERIES SmartSequencer ...

Страница 2: ... due to line sags and brown outs This means that inrush currents are offset in time rather than occurring simultaneously This can also be advantageous to upstream equipment if the sequencer is supplementing other power management such as a UPS or voltage regulator The Furman Contractor CN 3600SE provides three delay stages Each stage is independently fused and protected If three stages of power se...

Страница 3: ...an contractor devices to be linked together and controlled up to distances of 300 Meters about 1000 feet SmartSequencing devices can be chained to gether to form a network of sequencers A maxi mum of 99 SmartSequencers can be linked to gether to form a SmartSequencing network that spans a distance of 30 KM 18 2 Miles SmartSequencing devices can be connected to gether without regard for polarity wi...

Страница 4: ...NEGATIVE 12VDC RETURN PIN 2 TRANSMIT DATA PIN 3 RECEIVE DATA PIN 4 ACCESSORY POWER ONLY PIN 5 SIGNAL GROUND PIN 6 ACCESSORY POWER ONLY PIN 7 REQUEST TO SEND PIN 8 CLEAR TO SEND PIN 9 ACCESSORY POWER ONLY POSITIVE 12V DE 9 FEMALE CONNECTOR RS 232 DELAY 3 OUTLET BANK Rear LED Indicates unit is receiving AC power and Unswitched outlets are active DE 9 Communications port can also provide power Pin 2 ...

Страница 5: ...tSequencing technology provides a very simple means of connecting together a group of Furman Contractor devices to form a network or chain of sequencers SmartSequencing al lows all devices within a chain to be controlled and queried from a single Primary sequencer One of the defining characteristics of SmartSe quencing technology is its ability to allow any one to quickly achieve professional resu...

Страница 6: ... set these switches in any posi tion you like to achieve your preferred time de lay The table below summarizes the settings of DIP switch positions 1 2 3 and corresponding maximum time delay Example If the DIP Switches are set to a 6 min ute maximum time delay and the DLY ADJ is set to its 50 setting then the delay interval be tween sequenced banks will be 3 minutes DIP 1 OFF or DOWN DIP 2 and DIP...

Страница 7: ...utton is pressed and then open again when the button is released Momentary switching allows multiple push button switches to be connected in parallel with the REM input This allows the CN 3600SE to be toggled ON or OFF from mul tiple locations DIP 5 DIP 6 Outlet behavior as a function of the REM signal input OFF OFF Outlet is deactivated when REM is connected to 12VDC ON OFF Outlet is activated wh...

Страница 8: ... GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2 3 4 5 6 7 8 9 1M 1 2 3 4 5 2M 4M N O N C 12V ON 12V OFF GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2 3 4 5 6 7 8 9 1M 1 2 3 4 5 2M 4M N O N C 12V ON 12V OFF GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2 3 4 5 6 7 8 9 ON MNT SEC MANUAL 6 7 8 9 9 1M 1 2 3 4 5 2M 4M N O N C 12V ON 12V OFF GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2...

Страница 9: ...configured to au tomatically clear EVS errors DIP Switch 9 ON this LED will turn off approximately 5 seconds after the incoming line voltage has returned to normal If the unit is configured for manual EVS recovery DIP Switch 9 OFF this LED will remain illuminated Red until the EVS error has been manually cleared See page XXX for further details The 16A front panel breaker provides an overall curre...

Страница 10: ... 3600SE The GND terminal pin serves a ground reference point for all other pins on the remote terminal connector GND is also intended to be fed back into the REM pin when the CN 3600SE is config ured for GND ON mode This is explained in detail in section DIP 5 and 6 Remote Input Setting on page 6 Pin Label Description 1 12V General purpose 12VDC output 12 mA 2 STAT Status output intended to drive ...

Страница 11: ... the foregoing section and press the SEQUENCE START button or turn the Key Switch to the ON position Multiple Unit Set Up If you plan to use more than one CN 3600SE sequencer in a SmartSequencing network or chain the factory default DIP Switch settings will be correct for the first Primary unit only Subsequent downstream CN 3600SE s will need to be configured as Secondary devices To do this you wi...

Страница 12: ... S S 12 STAT REM GND UNIT 2 SECONDARY INTERFACE NO NC C FORCE OFF FORCE OFF FORCE OFF FORCE OFF FORCE OFF FORCE OFF FORCE OFF FORCE OFF NO NC C CN 3600SE CN 3600SE CN 3600SE ON 1 2 3 4 5 6 7 8 9 SECONDARY DIP SWITCH SET SYSTEM CONTROLLER RS 232 PROTOCOL CN 3600SE 12 STAT REM GND System controllers can interface with the CN Series sequencers locally or from the cloud Yet also be interrupted by fire...

Страница 13: ... tinguish as soon as voltage returns to normal If the EVS is set to MANUAL the EVS error will need to be manually cleared Please refer to section XXX on page YYY for details on how to clear the EVS error 9 My sequencers are out of sync Sequencers can fall out of sequence if one or more sequencers experience a power failure or an EVS condition When this happens the sequencer will normally remain of...

Страница 14: ...x type 5 Pin Connector with Screw Terminals FORCE OFF DELAY 3 32VDC at 100mA Max RS 232 Compatible DE 9 Connector IP Addressability Optional via BB RS232 Ethernet RS 232 Adaptor sold separately for IP control via BlueBOLT Voltmeter Available with RS 232 and other options 1VAC accuracy Ammeter Available with RS 232 and other options 0 3 A accuracy 4 Thermal Circuit Breakers pushbutton Power Consump...

Отзывы: