Fumex Me 75 EX Скачать руководство пользователя страница 10

10

Tes

�ng and t

r

oubl

e

shoo�ng

The mo

s

t important factor f

or s

a

�s

factor

e

xplosion p

rot

ec�on is th

at the gr

ounding of the equipme

n

t is 

in good c

ondi�on. Check this by m

ea

suring the 

re

sis

t

ance with an accu

rate ohmmet

er b

etween the 

gr

ound 

c

onnec�ons 

a

t the b

rac

k

et

/

c

onnec�on 

to the e

x

tr

ac�on duct and suc�on h

ead. The re

sis

tance 

b

etw

een the suc�on h

ead and the gr

ound 

c

onnec�on/air duct mus

t not e

x

cee

d 100 

.

The re

sis

tance v

alue should be docume

nted prefer

ably in a log book 

to facilitate iden

f

ying a 

deteriora

�on of the 

e

xplosion p

rot

ec�on.

If the re

sis

t

ance is no�c

e

ably highe

r

, the 

rea

son 

f

or this must be 

f

ound by m

ea

suring the 

re

sis

tance 

b

etween the c

onnec�on 

t

o the equipme

n

t's g

r

ound and 

at di

erent point

s along the arm, s

t

ar�ng with 

the suc�on h

ead and 

s

tep 

by s

tep in towar

ds the 

a

achment. The f

ault sou

rce wi

ll be lo

cated a

s a 

re

sult. 

Replace def

ec�

ve component

s with n

ew

, original s

pare part

s. Whe

re ther

e is the slig

hte

st doubt, 

contact 

your n

eare

s

t dealer or head o

ffice.

In the event of re

duc

e

d suc�on 

cap

acity: check th

a

t damper is not clos

e

d, th

at all c

onnec�ons a

r

e �g

ht 

and that the f

an is in a s

a

�s

factor

c

ondi�on. 

Log book 

for mea

suring 

resistance

Re

sis

t

ans (

Ω)

Date

Re

sis

t

ans (

Ω)

Date

Re

sis

t

ans (

Ω)

Date

Содержание Me 75 EX

Страница 1: ...MANUAL M21W11_MME75_F_EN...

Страница 2: ...pplica ons 3 Technical data 3 Installa on and use 4 6 Cleaning 7 Service and repairs 7 Spare parts and accessories 8 9 Tes ng and troubleshoo ng 10 Log book for measuring resistance 10 Notes 11 Fumex...

Страница 3: ...rmal circumstances as regards temperature and air pressure The equipment thereby meets the requirements for equipment category 2 for gas and dust which means that it is suitable for use in zones 1 or...

Страница 4: ...wall or to the ceiling using special brackets Measure a suitable height for the bracket before moun ng the arm to the wall and check that the exis ng air duct reaches the hose when ng to the ceiling...

Страница 5: ...3 4 7 mm 100 mm C B A 2 1 M6x4 M6x4 5 5...

Страница 6: ...oo ng and the connec on to the earth system must have been checked NOTE Personnel working in environments where an explosive atmosphere may arise as well as all other people that enter the area must b...

Страница 7: ...low the equipment to dry before using again Remeasure the resistance to ground as per Tes ng and troubleshoo ng before using the extrac on arm again Service and repairs In addi on to the rou ne cleani...

Страница 8: ...pring tension type Gas spring holder collar black O ring Axis Connec on tube w sviwel A tube L 400 mm A tube L 550 mm A tube L 750 mm B tube L 300 mm B tube L 450 mm Complete hood joint Tension knob b...

Страница 9: ...hood joint B tube Tension knob O ring A tube Tension knob Connec on tube Internal spring Axis Complete hood joint B tube Tension knob Gas spring holder A tube Tension knob Connec on tube Spring Axis O...

Страница 10: ...teriora on of the explosion protec on If the resistance is no ceably higher the reason for this must be found by measuring the resistance between the connec on to the equipment s ground and at di eren...

Страница 11: ...11 Notes...

Страница 12: ...FUMEX Verkstadsv gen 2 931 61 SKELLEFTE Sweden Tel 46 0 910 361 80 Fax 46 0 910 130 22 info fumex se www fumex com...

Отзывы: