Ref / Pt.No: 294130
Operating Instructions for Safe Use
Fullwood M²erlin
Revision: C
Date: 24-Mar-17
294130
Page 15 of 81
2.19 Power Supply Specifications
•
Fullwood Ltd does not carry out any mains wiring. It is the responsibility of the
customer to arrange for all mains wiring to be carried out by a competent contractor
qualified in accordance with national and/or local legislation. This also applies to any
mains electrical connections from switches of isolators to electrical equipment
supplied by Fullwood Ltd.
•
The power requirements will vary significantly, depending on the ancillary equipment
specified.
•
Power consumption for all other pieces of equipment e.g.: Air Compressor, Vacuum
pump, Boiler Etc. will need to be calculated and specified per site.
•
Earthing; It is the responsibility of the customer to ensure that all metal parts of the
installation are bonded to earth in accordance with local and national legislation.
•
M²erlin must be earthed according to local legislation.
•
Starting up M²erlin without proper earthing will render the warranty null and void.
2.20 Ambient Temperature
Min
2°C
Max
45°C
2.21 Compressed Air Requirements
Number of M
2
erlins
CFM (m
3
/hr)
Stored Air
1
2 (3.4)
150L
2
4 (6.8)
150L
3
5 (8.5)
200L
4
6 (10.2)
200L
5
7 (11.9)
250L
6
8 (13.6)
250L
Note: Contact Fullwood for installations of over six M²erlins
Minimum supply pressure
7 bar
Maximum supply pressure
11 bar
Note: Specifications above are the requirements of the machine not of the compressor.
Most rotary compressors are 100% duty cycle so calculations are required. Most piston
compressors are 50% duty cycle so the compressor output needs to be double the
requirement detailed above.
2.22 Air Drying
•
The dryer must be rated to operate efficiently at the lowest typical temperature for
the country/area.
Supply
Supply Voltage
Volts
Max Current
Amps
Power factor
cos
f
Earth Leakage
mA RCD
1ph
216-253
25
>0.8
100
3ph
376-440
16
>0.8
100