Full Gauge Controls TC-900i power Скачать руководство пользователя страница 3

IMPORTANT

1:
2:

3:

According to the chapters from the IEC60364 standard:

Install

on power supply

Sensor cables and computer signals can be together, however not at the same place where power

supply and load wires pass for

Install suppresor of transient in parallel to loads to increase the usefull life of the relays

protectors against over voltage

For more information contact our application eng. department through e-mail

or dial +55 51 3475.3308.

support@ fullgauge.com

Contact suppresor connection diagram

Suppresor

A1

A2

A1 e A2 are the
contactor coils.

Diagram for suppresor installation
for direct drive load inputs

Load

Suppresor

For direct activation the maximum
specified current should be taken
into consideration.

Note: The sensor cable lenght can be increased by the user until 200 meters using 2 x 24AWG cable.

PROTECTIVE

:

VINYL

This adhesive vinyl (included inside the packing) protects the instruments against
water drippings, as in commercial refrigerators, for example. Do the application after
finishing the electrical connections.

Remove the protective paper
and apply the vinyl on the entire
superior part of the device,
folding the flaps as indicated by
the arrows.

72 mm

Dimension of the clipping

for setting of the instrument

in panel

29

mm

Отзывы: