Full Gauge Controls MT-512G Скачать руководство пользователя страница 2

105mm

90mm

50mm

8mm

44mm

44mm

Frontal

key

9. KEYS

10. DIMENSIONS

IMPORTANT

1:
2:

3:

According to the chapters of norm IEC 60364:

Install

on the power supply.

Sensor cables and signal cables of the computer may be joined, but not in the same electric conduit

through which the electric input and the activation of the loads run.

Install transient suppresors (RC filters) parallel to the loads as to increase the product life of the

relays.

protector against overvoltage

Schematic for the connection of supresors to contactors

Suppresor

A1

A2

A1 and A2 are the
contactor coil terminals.

Schematic for the connection of supresors to direct activation loads

Load

Suppresor

For direct activation the maximum
specified current should be taken
into consideration.

Accessible in the front side of the instrument.

Отзывы: