C17AK0006 REV.1SLIMBOX-V, INDOOR/OUTDOOR ENCLOSURE-4F
ISSUE DATE 8/9/2017
pg. 5
3.
Remove the grommet by sliding forward and notch through the web in order for the
cable to enter. Run the cable through the notch and place the grommet back in the
enclosures. The cable grommet is notched in the center and the drop cable is cut from the
bottom. The fiber in the Indoor/Outdoor cable is 250 um and will require an up-jacket
with 900 um tubing using the D-181755 or similar kit when the installation is terminating
in the enclosure. See step 6 for mid span entry of the Indoor/Outdoor cable.
4.
When using OSP cable, the cable is prepped prior to inserting the cable in the cable
clamp. The cable clamp and the strength member clamp are removed with a Phillips
head screw driver. The strength member is prepped two inches beyond the end of the
cable. The cable clamp is attached on the Outside plant cable and the prepped end is
located slightly beyond the clamp. Outside plant cable can’t be used in a mid-span
installation. The 250 um fiber will require an up-jacket with 900 um tubing using the D-
181755 or similar kit when connectorizing and the fiber is placed in a tube to transfer to
the splice tray when splicing.
Strength Member Clamp
Cable Clamp