Table
5.1
Mounting
Order
in
Blade
Installation
CMU#00
CMU#01
CMU#02
CMU#03
Number
of
blades:
1 1
Number
of
blades:
2 1
2
Number
of
blades:
3 1
2
3
Number
of
blades:
4 1
2
3
4
-
At
any
of
these
locations
where
no
blade
will
be
mounted,
always
install
a
dummy
blade
in
order
to
comply
with
applicable
EMC
directives.
5.2
Replacing
the
Blade
Work
contents:
Field
replaceable
unit
(FRU)
Work
time:
20
minutes
for
hardware
Tools:
None
required
5.2.1
Preliminary
Steps
Perform
the
following
procedure
to
prepare
for
blade
replacement.
1.
Look
for
the
target
blade
according
to
"
."
2.
Shut
down
that
blade.
See
"
3.
From
the
Web
GUI,
configure
CMU
replacement
in
maintenance
mode.
4.
Remove
all
external
cables
from
the
blade.
Remarks
If
your
finger
is
too
big
to
touch
the
connector
lock
when
disconnecting
a
LAN
or
other
cable,
the
cable
cannot
be
removed.
In
that
case,
unlock
the
connector
lock
by
pushing
it
with
a
flathead
screwdriver.
Then,
remove
the
cable
by
pulling
it
and
the
screwdriver
out
together.
5.2.2
Removing
the
Blade
See
"
5.2.3
Removing
the
Riser
Module
and
M.2
SSD
Remove
all
the
riser
modules
and
M.2
SSDs
from
the
blade.
See
"
See
"
."
Chapter
5
Blade
C120-0090-04EN
5.2
Replacing
the
Blade
39