20
U41161-J-Z126-1-76
Control panel on the global storage cabinet
Controls and indicators
POWER COMPLETE
This green light is lit up after the system power controller has terminated the switching
on sequence without any errors. The light is extinguished when the STAND-BY button
is pressed in the S140 control panel.
SSU CHECK
The display illuminates if there is an error in global storage. The buzzer sounds at the
same time.
BATTERY STATUS
These indicators indicate the status of the backup battery:
Potentiometer for volume
This is used to set the volume of the buzzer.
Potentiometer for brightness
This is used to set the brightness of the LCD display.
4.2.2
Button functions
LCD BACK LIGHT
The LCD display STATUS (background) is illuminated for five minutes when you press
this button. The lights go out immediately when you press this button again.
CANCEL / ALARM STOP
When this button is pressed in the event of an error, the buzzer in the control panel is
stopped and the SSU CHECK light is extinguished. If another malfunction occurs after
the light is extinguished, e.g. a machine error or a malfunction in the power supply, the
buzzer and the SSU CHECK light are reactivated.
Name
Color
Meaning
Measure
BS
green
Backup battery is installed
BBON
green
Backup battery is active
BI
green
Backup battery is not available
DI
green
Data in the global memory are invalid
DS
green
Indicator is not in use
BE
yellow
Error in backup battery operation
Call service dept.
BF
yellow
Error in the backup battery
Call service dept.
Содержание S140
Страница 6: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Страница 34: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Страница 94: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Страница 96: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Страница 108: ......
Страница 112: ......