Concluding steps
▶
Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
▶
.
▶
"Connecting the power cord" on page 82
.
▶
"Switching on the server" on page 83
.
▶
BIOS settings are automatically reloaded. Time and date must be set
manually, see
"Verifying the system time settings" on page 126
.
14.4
Trusted Platform Module (TPM)
14.4.1
TPM kit
Figure 308: TPM installation kit
1
TPM
2
TPM spacer
3
Special screw for TPM
4
TPM bit insert for TPM special screw
14.4.2
Installing the TPM
Field Replaceable Unit
(FRU)
Hardware: 5 minutes
Software: 5 minutes
System board and components
476
Upgrade and Maintenance Manual
TX2550 M5
Содержание PRIMERGY TX2550 M5
Страница 20: ...Content Upgrade and Maintenance Manual TX2550 M5 ...
Страница 106: ...Basic hardware procedures 106 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 322: ...Fans 322 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 392: ...Expansion cards and backup units 392 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 408: ...Main memory 408 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 428: ...Processor CPU 428 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 522: ...System board and components 522 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 590: ...FUJITSU Server PRIMERGY TX2550 M5 System Cabling Overview System Cabling Overview English Cable plan for May 2019 ...
Страница 631: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...