28
Upgrade and Maintenance Manual
TX1320 M4
Before you start
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
See the following table for an overview of steps taken into account for
calculating the average task duration:
Hardware: 10 minutes
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
For software tasks necessary before
maintenance, see section
.
Disassembly
yes
making the server available
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
maintenance procedures including
preliminary and concluding software tasks
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly
yes
reassembling the server
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Содержание PRIMERGY TX1320 M4
Страница 20: ...Upgrade and Maintenance Manual TX1320 M4 Contents ...
Страница 32: ...32 Upgrade and Maintenance Manual TX1320 M4 Before you start ...
Страница 46: ...46 Upgrade and Maintenance Manual TX1320 M4 Important information ...
Страница 96: ...96 Upgrade and Maintenance Manual TX1320 M4 Basic software procedures ...
Страница 128: ...128 Upgrade and Maintenance Manual TX1320 M4 Power supply unit PSU ...
Страница 216: ...216 Upgrade and Maintenance Manual TX1320 M4 Main memory ...
Страница 260: ...260 Upgrade and Maintenance Manual TX1320 M4 Accessible drives ...
Страница 312: ...312 Upgrade and Maintenance Manual TX1320 M4 System board and components ...
Страница 340: ...340 Upgrade and Maintenance Manual TX1320 M4 Appendix A ...
Страница 342: ...342 Upgrade and Maintenance Manual TX1320 M4 Appendix B ...
Страница 343: ...FUJITSU Server PRIMERGY TX1320 M4 Reference Manual Reference Manual English Cable Plan for January 2019 ...
Страница 367: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...