U41100-J-Z156-1-74
7
PRIMERGY S40-DF capacity extension Converting the PRIMERGY S40-DF
Ê
Remove the rack storage subsystem from the rack.
V
CAUTION!
For removing the device from the rack, ask someone to assist you.
For more assistance, see the operating instructions for the
“PRIMERGY S40-DF Storage Subsystem” (see section “Related
publications” on page 21).
Ê
Remove the protective shield for the SCSI area of the storage subsystem
(see section “Removing and mounting the protective shield” on page 10).
Ê
Convert the internal configuration of the storage subsystem from a
3-channel configuration to a 1-channel configuration (see section
“Converting the internal configuration” on page 11).
Ê
Mount the protective shield for the SCSI area (see section “Removing and
mounting the protective shield” on page 10).
Ê
Insert the storage subsystem back in the rack and fasten it with the four
knurled screws.
Ê
Install the LVD extender board (see section “Installing the LVD extender
board” on page 17).
Ê
Install the three PRIMERGY S40-ES units in the rack with the help of the
operating instructions for the “PRIMERGY S40-BS/-ES Storage
Subsystem“.
Ê
Connect the three PRIMERGY S40-ES units to the corresponding SCSI
ports on the LVD extender board (see section “Connecting the capacity
extension” on page 19).
I
Note that if the PRIMERGY S40-ES is connected, the system
parameters PWR ON/OFF BY BUTTON and PWR ON/OFF BY CAN
must be set to DISABLE.
Ê
Connect the PRIMERGY S40-DF and the three PRIMERGY S40-ES units
to the power supply.
Ê
Connect the PRIMERGY S40-DF to the PRIMERGY server.