RX2530 M4
Operating Manual
69
Starting up and operation
6.1.2.2
Indicator on PSU (slide-in unit)
Figure 17: PSU status indicator (AC PSU)
Figure 18: PSU status indicator (DC PSU)
Pos. Indicator
Status
Description
1
PSU status
indicator
green
flashing
The server is switched off, but AC voltage /
DC voltage is present (standby mode).
green on
The server is switched on and operating
properly.
orange
flashing
An overload has been detected. The PSU is
still running, but failure might be imminent.
orange on
An PSU failure has been detected. Possible
causes:
– Over/under voltage
– Overheating
– Fan failure
0
Содержание PRIMERGY RX2530 M4
Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2530 M4 Operating Manual June 2018 ...
Страница 8: ...Operating Manual RX2530 M4 Contents ...
Страница 12: ...12 Operating Manual RX2530 M4 Introduction ...
Страница 58: ...58 Operating Manual RX2530 M4 Hardware installation ...
Страница 80: ...80 Operating Manual RX2530 M4 Starting up and operation ...
Страница 82: ...82 Operating Manual RX2530 M4 Property and data protection ...