RX200 S5
Options Guide
11
2
Procedure
V
CAUTION!
●
The actions described in this manual should only be performed by
technical specialists.
●
Repairs to the device that do not relate to CSS failures must only be
carried out by service personnel. Please note that unauthorized inter-
ference with the system will void the warranty and exempt the
manufacturer from all liability.
●
Any failure to observe the guidelines in this manual, and any improper
repairs could expose the user to risks (electric shock, energy
hazards, fire hazards) or damage the equipment.
Ê
First of all, carefully read the safety instructions in the
chapter “Safety
instructions” on page 13
et seq..
Ê
Make sure that all necessary manuals (see the
section “Documentation
overview” on page 5
) are available; print the PDF files if required. Most
importantly, you will need the operating manual for the server and the
technical manual for the system board.
Ê
Shut the server down correctly, switch it off, disconnect the power plugs and
open the server as described in the
chapter “Preparation” on page 19
et
seq..
Ê
Carry out the expansion or upgrade of your server as described in the
pertinent chapter.
I
Installation and removal of the hot-plug components are described in
the operating manual.
Ê
Close the server, connect it to the power outlet, and switch it on as described
in the
chapter “Completion” on page 61
et seq..
Ê
Start the operating system and make the appropriate configuration if
necessary (see the operating manual).