RX100 S8
Operating Manual
53
Hardware installation
5.3.1
Connecting the monitor
Ê
Plug the data cable for the monitor into the video connector on the server
(item 4 in figure
3 on page 52
).
V
CAUTION
The height of VGA cable connectors can vary. Please make sure that the
VGA connector cables do not interfere with the server below.
Ê
Connect the insulated connector on the monitor power cable to a grounded
outlet in the rack's socket strip (see also the technical manual for the rack).
5.4
Connecting the server to the mains
In its basic configuration the server has a permanently installed power supply
unit or a hot-plug power supply unit. Besides the hot-plug power supply unit, a
second hot-plug power supply unit can be installed optionally to serve as a
redundant power supply. If one power supply unit fails, the second power supply
unit in the redundant configuration ensures operation can continue
uninterrupted.
V
CAUTION!
The server is automatically set to a mains voltage in the range 100 V -
127 V / 200 V - 240 V. You may only operate the server if its rated voltage
range corresponds to the local mains voltage.
Ê
Connect the power cord to the server power supply unit.
Ê
Connect the mains connector to an outlet on the rack's socket strip.
I
For details, please see the technical manual for the rack.
Содержание PRIMERGY RX100 S8
Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY RX100 S8 Operating Manual Edition November 2013 ...
Страница 6: ...Operating Manual RX100 S8 ...
Страница 10: ...Operating Manual RX100 S8 Contents ...
Страница 14: ...14 Operating Manual RX100 S8 Introduction ...
Страница 58: ...58 Operating Manual RX100 S8 Hardware installation ...
Страница 76: ...78 Operating Manual RX100 S8 Property and data protection ...