background image

Содержание PRIMERGY BX620 S5

Страница 1: ...PRIMERGY BX620 S5 Server Blade Options Guide Edition July 2009 ...

Страница 2: ...dliness this documentation was created to meet the regulations of a quality management system which complies with the requirements of the standard DIN EN ISO 9001 2000 cognitas Gesellschaft für Technik Dokumentation mbH www cognitas de cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4593 001 fm Copyright 2009 Fujitsu Technology Solu...

Страница 3: ... 7 1 4 Structure of the server blade 9 1 5 Notational conventions 11 2 Procedure 13 3 Notes on safety 15 4 Preparation 19 4 1 Opening the server blade 19 5 Processors 23 5 1 Installing a second processor 23 6 Memory modules 29 6 1 Fitting rules 31 6 2 Upgrading replacing the main memory 32 7 Optional I O module 33 7 1 Installing an I O daughter card 37 ...

Страница 4: ...ft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4594 001 fm 8 Storage modules 39 8 1 Storage module variants 40 8 2 Replacing a storage module 45 9 Completion 47 9 1 Closing the server blade 47 Index 49 ...

Страница 5: ...d disk configurations for different usage scenarios The configuration options range from the low cost platform with SATA hard disks up to the high end platform with SAS hard disks and an SAS storage module with RAID5 and Cache iTBBU As an option the communications interfaces can be extended by two Fibre Channel channels or two additional Ethernet channels 1 1 Concept and target groups of this manu...

Страница 6: ...ne documentation available for downloading You can go to the PRIMERGY server documentation by clicking on Industry standard servers More information on your PRIMERGYBX620 S5 can be found in the following documents PRIMERGYBX620 S5 Server Operating Manual PRIMERGYBX620 S5Server Service Supplement DVD booklet Quick Start Software Quick Installation Guide only included as a printed copy with the PRIM...

Страница 7: ...s 2 GB 4 GB and 8 GB I A combination of both module types is not allowed Optional I O module The server blade has one slot for an extension board daughter card which can be used to provide two Fibre Channel connections or two additional Ethernet connections The following I O modules are available 4 Gbit Fibre Channel daughter card PCIe 1 Gbit Ethernet daughter card PCIe 10 Gbit Ethernet daughter c...

Страница 8: ... mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4595 001 fm Storage modules can be installed replaced via the front of the server blade without having to remove the housing cover However they cannot be replaced while the system is running non hot plug the server blade must be switched off ...

Страница 9: ... 9 Introduction Structure of the server blade 1 4 Structure of the server blade Figure 1 PRIMERGYBX620 S5 server blade The figure 1 shows the positions of the most important components of the server blade 6 7 8 0 1 2 3 4 5 9 ...

Страница 10: ... I O daughter card Fibre Channel or Gigabit Ethernet daughter card optional 2 CPU 2 with heat sink 3 Slots for the CPU 2 memory modules 4 USB Flash Module UFM 5 Lithium battery on the system board 6 Trusted Platform Module TPM 7 Control panel board with foil cable 8 2 5 inch hard disk module 1 SAS or SATA 9 2 5 inch hard disk module 2 SAS or SATA 10 Storage module 11 Slots for the CPU 1 memory mod...

Страница 11: ...ystem BIOS enabled OFF Restore system BIOS disabled Switch 4 ON Reserved OFF Reserved Switch 5 ON Reserved OFF Reserved Switch 6 ON Reserved OFF Reserved Text in italics indicates commands or menu items Quotation marks indicate names of chapters and terms that are being emphasized Ê describes activities that must be performed in the order shown V CAUTION pay particular attention to texts marked wi...

Страница 12: ... cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4595 001 fm ...

Страница 13: ... chapter Notes on safety on page 15 Ê Make sure that all the manuals you need see Documentation overview on page 6 are available printing out the PDF files if necessary You will definitely need the operating manual for the server blade and the Service Supplement Ê Shut down the server blade correctly switch it off and remove it from the basic unit as described in the chapter Preparation on page 19...

Страница 14: ... cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4596 001 fm ...

Страница 15: ...sonnel Please note that unauthorized inter ference with the system will void the warranty and exempt the manufacturer from all liability Any failure to observe the guidelines in this manual and any improper repairs could expose the user to risks electric shock energy hazards fire hazards or damage the equipment Before starting up V CAUTION During installation and before operating the device observ...

Страница 16: ... requirements of the specification ISO IEC 11801 must also be taken into account Route the cables in such a way that they do not form a potential hazard tripping and cannot be damaged When connecting the device refer to the relevant notes in the operating manual Do not connect or disconnect any data transmission cables during a thunderstorm lightning hazard Make sure that no objects such as bracel...

Страница 17: ...e resolutions and refresh rates specified in the operating manual for your monitor Otherwise you may damage the monitor If you are in any doubt contact your sales outlet or customer service center Batteries V CAUTION Incorrect replacement of batteries may lead to a risk of explosion The batteries may only be replaced with identical batteries or with a type recommended by the manufacturer Do not th...

Страница 18: ...r outlets before installing or removing components with ESDs You must always discharge static build up e g by touching a grounded object before working with such components Any devices or tools that are used must be free of electrostatic charge Wear a suitable grounding cable that connects you to the external chassis of the system unit Always hold components with ESDs at the edges or at the points...

Страница 19: ... Exit all applications and shut down the server blade correctly Ê Press the On Off button on the server blade control panel Removing the server blade from the basic unit Figure 3 Removing the server blade Ê Press the two green touch points 1 to unlock the ejection levers Ê Open out the two ejection levers 2 simul taneously to disengage the server blade 1 1 2 2 ...

Страница 20: ...the server blade Preparation cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4598 001 fm Figure 4 Removing the server blade Ê Pull the server blade out of the basic unit ...

Страница 21: ...ure 5 Removing the cover Ê Press the two touch points 1 of the cover simultaneously to disengage it and slide back the cover as far as it will go in the direction of the arrow 2 Ê Take off the cover plate The server blade components are now freely accessible see figure 1 on page 9 1 1 2 ...

Страница 22: ... cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4598 001 fm ...

Страница 23: ...et place it on an insulated antistatic surface with the smooth side down Never slide a processor over a surface 5 1 Installing a second processor If only one processor is installed in your server blade you can upgrade it to include a second one V CAUTION Always use processors of the same type All processors must have the same frequency capacity and organization For multi processor operation use a ...

Страница 24: ...cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4599 001 fm Removing the dummy heat sink Figure 6 Removing the dummy heat sink Ê Undo the two screws which fasten the dummy heat sink and remove it 2 2 1 ...

Страница 25: ...g the locking lever of the processor socket Ê Press the locking lever of the processor socket out of its locking position arrows and swivel it upward Figure 8 Opening the locking frame of the processor socket Ê Open up the locking frame of the processor socket and take off the black protective cover arrow 1 2 ...

Страница 26: ... Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4599 001 fm Figure 9 Inserting the processor Ê Place the processor in the socket making sure the marks on the processor point to the corresponding marks on the socket a a ...

Страница 27: ...ure 10 Closing the locking frame of the processor socket Ê Close the locking frame of the processor socket 1 swivel the locking lever downward 2 and lock it under the small clip a that is attached to the socket Installing the heat sink Figure 11 processor heat sink 1 2 a ...

Страница 28: ...t sink Ê Carefully place the heat sink onto the CPU Ê Fix the heat sink by fastening the four premounted screws in diagonally opposite sequence V CAUTION Never install a processor without a heat sink The processor is likely to overheat which may cause damage to the processor and the system board Ê Close the server blade place it in the system unit and switch on the server blade as described in the...

Страница 29: ...m memory configuration of 24 GB with UDIMMs capac ities 1 GB and 2 GB and 96 GB with RDIMMs capacities 2 GB 4 GB or 8 GB I A combination of UDIMM and RDIMM memory modules is not allowed Memory operating modes Independent Channel Mode maximum memory configuration The full capacity of the installed memory can be used up to 96 GB There are no restrictions on fitting the individual channels and you ca...

Страница 30: ...ly used to ensure failsafety they contain the mirrored data of channels A and D Channels C and F are not used The two channels of each CPU that are in use A B or D E must be fitted with identical modules This mode requires RDIMM memory modules Performance Mode high memory configuration with highest performance All slots of a memory bank are used The main memory can be configured up to its full cap...

Страница 31: ...d If you want to install memory modules with different capacities you must install the modules with the least memory capacity first only possible in Independent Channel Mode You can combine memory modules with different clock rates 1066 MHz and 1333 MHz However the system will set the lower clock rate CPU 2 DIMM 1F DIMM 2F DIMM 1E DIMM 2E DIMM 2D DIMM 1D Channel F Channel E Channel D CPU 1 DIMM 1C...

Страница 32: ...eparation on page 19 Figure 15 Removing a memory module Ê Flip out the fastening tabs on both sides of the relevant slot 1 Ê If the slot was filled pull the memory module out of the slot 2 Figure 16 Installing a memory module Ê Flip out the fastening tabs on both sides of the slot Ê Carefully press the memory module into the slot 1 until the fastening tabs on both sides of it engage 2 Ê Close the ...

Страница 33: ... blade 4 Gbit Fibre Channel daughter card PCIe 1 Gbit Ethernet daughter card PCIe 10 Gbit Ethernet daughter card PCIe I To be able to use the additional I O functionality at least one FC I O blade or an Ethernet I O blade must be installed in slots NET3 and or NET4 of the BX600 S3 basic unit For further information on I O blades see the operating manual for your basic unit It is not possible to in...

Страница 34: ...gure 17 4 Gbit Fibre Channel daughter card PCIe The 4 Gbit FC daughter card PCIe provides two independent serial 1 2 4 Gbit s FC ports It is fitted with an Emulex chip and supports multiple FC storage subsystems of the corresponding versions I The 4 Gbit FC daughter card can only be used in combination with the 4 4 Gbit FC switch blade For further information see the operating manual for your BX60...

Страница 35: ...odule 1 Gbit Ethernet daughter card PCIe Figure 18 Gbit Ethernet daughter card PCIe The 1 Gbit Ethernet daughter card PCIe has two Broadcom 5708S chips and provides two 1 Gbit s Ethernet ports TOE TCP IP Offload Engine and iSCSI are supported ...

Страница 36: ...aughter card PCIe Figure 19 10 Gbit Ethernet daughter card PCIe The 10 Gbit Ethernet daughter card PCIe provides two 10 Gbit s Ethernet ports This module also supports TOE TCP IP Offload Engine and iSCSI I The 10 Gbit Ethernet daughter card PCIe can only be used in combi nation with the 10 Gbit switch blade 10 2 For further information see the operating manual for your BX600 S3 basic unit ...

Страница 37: ... card V CAUTION Please observe the safety information in the chapter Notes on safety on page 15 Ê Remove the server blade from the basic unit and open it as described in the chapter Preparation on page 19 Figure 20 Position for an I O daughter card Ê Plug the I O daughter card onto the two sockets see arrows ...

Страница 38: ... card Optional I O module cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4601 001 fm Figure 21 Installing an I O daughter card Ê Fasten the I O daughter card with three screws see arrows ...

Страница 39: ...the housing cover The following figure shows the position of the storage module in the open server blade Figure 22 Position of the storage module in the server blade There are three storage module variants with SAS hard disk controllers available which can also have additional optional functions SAS storage module SAS RAID storage module SAS PCIe storage module this variant allows the installation...

Страница 40: ... PICHOL OBJ_DOKU 4602 001 fm 8 1 Storage module variants This section introduces the different storage modules and describes the instal lation of the optional extensions BX620 S5 SAS storage module This storage module supports RAID 1 with Advanced Error Logging Figure 23 BX620 S5 SAS storage module 1 Connection to system board 2 SAS controller 3 Front panel 0 1 ...

Страница 41: ...press storage module This storage module supports RAID 1 with Advanced Error Logging and allows the installation of a low profile PCI Express card Figure 24 BX620 S5 SAS PCI Express storage module 1 Connection to system board 2 SAS controller 3 Front panel 4 PCI Express riser card 0 1 2 ...

Страница 42: ...le proceed as follows Figure 25 Opening the front panel Ê Open out the front panel to the left Figure 26 Installing the PCI card Ê Push the PCI card into the slot on the riser card 1 as far as it will go Ê Secure the PCI card with a screw 2 How to install the storage module in the server blade is described in the section Replacing a storage module on page 45 Ê Undo the screw which secures the fron...

Страница 43: ...D storage module This storage module supports RAID 0 1 as standard and optionally RAID 5 with a 256 MB DDR2 Cache iTBBU card Figure 27 BX620 S5 SAS RAID storage module 1 Riser card for a BBU card 2 Connection to motherboard 3 SAS controller 4 Socket for the RoMB activation key 0 1 2 ...

Страница 44: ...009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4602 001 fm To install a BBU card in the storage module proceed as follows Figure 28 Installing the RoMB activation key Ê Place the RoMB activation key in the round socket see arrow V CAUTION Make sure the writing on the RoMB activation key is facing upward ...

Страница 45: ...e notches of the BBU card 2 How to install the storage module in the server blade is described in the following section 8 2 Replacing a storage module V CAUTION Please observe the safety information in the chapter Notes on safety on page 15 You must switch off the server blade before replacing the storage module non hot plug All variants of the storage module are installed and removed in the same ...

Страница 46: ...on the storage module Figure 31 Removing the storage module Installation To install a storage module follow the steps in reverse order Ê Undo the two screws 1 which fasten the storage module to the frame of the server blade Ê Undo the screw 2 on the front panel of the storage module Ê Open out the front panel 1 as shown in the figure This unlocks the storage module Ê Pull the storage module out of...

Страница 47: ...he cover of the server blade on the housing at a distance of 1 2 cm from the frame such that the cover lies flush with the edges on both sides Ê Push the cover forward in the direction of the arrow see figure 32 until it engages Ê Insert the server blade in the basic unit I To insert the server blade follow the procedure described in Removing the server blade from the basic unit on page 19 in reve...

Страница 48: ... cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad W Anwendungsdaten FCT tim_local work PICHOL OBJ_DOKU 4603 001 fm ...

Страница 49: ...nformation material additional 6 install Ethernet I O module 35 36 Fibre Channel I O module 34 memory modules 32 processor 23 storage modules 39 L lithium battery 17 M main memory fitting rules 31 upgrade 32 meaning of the symbols 11 memory operating modes 29 upgrade options 7 memory modules fitting rules 31 install 32 N notational conventions 11 P processor overheating 28 R RDIMM memory modules 7...

Страница 50: ......

Отзывы: