2.2 MMB Connection and Setup
2.2
MMB Connection and Setup
When you start MMB setup, the MMBs are in a test environment constructed by a
certified service engineer, and test programs have been executed in it. Therefore, you
need to reset the MMBs for actual operation.
More specifically, you need to specify MMB IP addresses and connect cables
assuming actual operation. After the MMBs are connected, use the MMB Web-UI
(Web user interface) to register and specify the user accounts, security parameters,
time, and other MMB settings.
The figure below shows the MMB connection and setup flow.
2.2.1
Connection environment settings for actual operation
The connection environment for testing must be reset for actual operation. You need
to perform the following operations:
z
Specifying the IP address for the PC to be used as the MMB console
(
→
z
Connecting the MMB console PC to the MMB user port
(
→
z
External LAN connection for PRIMEQUEST (PRIMEQUEST 580A/540A/580/
(
→
)
Connection environment settings for
actual operation
→
Network settings for actual operation
→
MMB initialization
→
z
Set up the connection environment for actual
operation.
z
Set up the network and Web server to be used
for actual operation.
z
Registration of user accounts
z
Setting user account of certified service
engineer
z
Setting system name
z
Setting date and time
z
Setting Telnet
z
Setting a VLAN in a administration LAN hub
Содержание PRIMEQUEST 400 Series
Страница 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Страница 2: ......
Страница 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Страница 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Страница 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Страница 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Страница 22: ......
Страница 24: ......
Страница 42: ......
Страница 46: ......
Страница 122: ......
Страница 140: ...3 18 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 150: ...3 28 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 186: ......
Страница 354: ......
Страница 356: ......
Страница 378: ...C 4 C122 E001 10EN Appendix C Power Control Figure C 3 Circuit breaker locations Extended I O Cabinet Circuit breaker ...
Страница 394: ......
Страница 428: ......
Страница 445: ......
Страница 446: ...Back Cover ...