82
Power Distribution
©
c
o
g
n
it
as
. Ges
e
lls
c
h
ft
f
ü
r T
e
c
hni
k
-D
o
k
u
m
e
n
tat
ion m
b
H 20
11
P
fa
d
:
O
:\
F
T
S
\P
RI
M
E
R
G
Y
-HW
\R
a
c
k
\P
C
R
-M
1
-R
ac
k
\M
anua
ls
\U
s
e
r M
anu
al
\0
2
_
wo
rk
\pc
r-
m
1
-r
ac
k
-u
m
-en
\pc
rm
1-
rac
k
-u
m
-e
n
.k
0
7
7.3.3.1
Installation options for 700 mm wide asymmetrical racks
Performing the task
Ê
Install two PDU brackets as described on
page 69
.
Figure 50: 32 A three-phase socket strip mounted in a 700 mm wide asymmetrical rack
Ê
Screw the socket strip with 2 screws onto the PDU brackets.
Rack height
Installation direction vertically
Installation direction
horizontally
42 HU
conditionally possible
1
Max. 2x with PDU kit 3 HU
24 HU
conditionally possible
1
1
Installation only possible on the left rear side (front side view). Cable routing is restricted.
Max. 2x with PDU kit 3 HU
Table 8: Installation options for asymmetrical racks