background image

82

 

 

 

Power Distribution

©

 c

o

g

n

it

as

. Ges

e

lls

c

h

ft

 f

ü

r T

e

c

hni

k

-D

o

k

u

m

e

n

tat

ion m

b

H 20

11 

P

fa

d

O

:\

F

T

S

\P

RI

M

E

R

G

Y

-HW

\R

a

c

k

\P

C

R

-M

1

-R

ac

k

\M

anua

ls

\U

s

e

r M

anu

al

\0

2

_

wo

rk

\pc

r-

m

1

-r

ac

k

-u

m

-en

\pc

rm

1-

rac

k

-u

m

-e

n

.k

0

7

7.3.3.1

Installation options for 700 mm wide asymmetrical racks

Performing the task

Ê

Install two PDU brackets as described on 

page 69

.

Figure 50: 32 A three-phase socket strip mounted in a 700 mm wide asymmetrical rack

Ê

Screw the socket strip with 2 screws onto the PDU brackets.

Rack height

Installation direction vertically 

Installation direction 
horizontally 

42 HU

conditionally possible

1

Max. 2x with PDU kit 3 HU

24 HU

conditionally possible

1

1

Installation only possible on the left rear side (front side view). Cable routing is restricted.

Max. 2x with PDU kit 3 HU

Table 8: Installation options for asymmetrical racks

Содержание PRIMECENTER M1 19-inch Rack

Страница 1: ...User Manual English PRIMECENTER M1 19 inch Rack Rack System for PRIMERGY PRIMEQUEST BS2000 STORAGE February 2012 ...

Страница 2: ... Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en vor Copyright 2012 Fujitsu Technology Solutions GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers The contents of this manual may be revised without prior notic...

Страница 3: ...o interference in which case the user may be required to take appropriate measures High safety use This product has been designed and manufactured for general uses such as general office use personal use domestic use and normal industrial use It has not been designed or manufactured for uses which demand an extremely high level of safety and carry a direct and serious risk to life or body if such ...

Страница 4: ... Control Law of Japan Documents produced by FUJITSU may contain technology controlled by the Foreign Exchange and Foreign Trade Control Law of Japan Documents which contain such technology should not be exported from Japan or transferred to non residents of Japan without first obtaining authorization in accordance with the above law Harmonic Current Standards This product conforms to harmonic curr...

Страница 5: ...mponents 19 2 3 Environmental Protection 20 3 Overview 23 4 Preparations 27 4 1 Unpacking the delivery unit 29 4 2 Rolling off the PRIMECENTER M1 19 inch rack from the transport palette 29 4 3 Setting up the PRIMECENTER M1 19 inch rack 29 4 4 Installing the tilting protection 31 4 5 Opening the rack door 32 4 6 Inserting mounting elements 33 4 6 1 Inserting Cage Nuts 33 4 6 2 Inserting Spring Nuts...

Страница 6: ...ble guide with cable clips 55 6 2 Connecting and disconnecting cables 56 6 2 1 Connecting Cables 56 6 2 2 Disconnecting Cables 57 6 3 Routing Cables 58 6 3 1 Routing cables in the rack 59 6 3 2 Routing cables using a lateral cable management 60 6 3 3 Cable routing and strain relief for the built in rack components in asymmetrical racks 61 6 3 4 Cable Guide with Cable Clips 64 6 3 5 Direct Connecti...

Страница 7: ... 3 safety plugs and assembly 98 7 3 8 Single phase 4 1 way socket strip and assembly 102 7 4 Connecting to the potential compensating system 105 7 5 Power Supply via UPS 106 8 Optional accessories 107 9 Appendix 109 9 1 Door conversion 109 ...

Страница 8: ...Contents cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en ivz ...

Страница 9: ...ames for the unique optimized Fujitsu cable management the rack family has been supplemented by symmetrical racks in widths of 600 und 700 mm By removing the side mounting locations the additional symmetrical version with a width of 600 mm requires less space within the data center This makes it ideally suited for data centers where minimal space requirements for the rack are an issue Figure 1 Dif...

Страница 10: ...on the side enables optimal ventilation with high heat throughput even in fully equipped and cabled racks with a low rack depth of 1050 mm The design ensures serviceability and ease of maintenance through a one piece front door and split rear doors The PRIMECENTER M1 rack systems with their lockable doors offer access protection for servers backup media and optical drives They also offer protectio...

Страница 11: ...ttractive design with honeycomb shaped perforations also offer approx 80 holes optimal prerequisites for the cooling of high performance systems Design 24U and 42U 700 mm x 1050 mm asymmetrical 24U and 42U 700 mm x 1050 mm symmetrical 16U 24U and 42U 600 mm x 1050 mm symmetrical Rack height Max rack height approx 2000 mm without pallet Capacity 16 to 42 height units plus up to 6 vertical height un...

Страница 12: ...om the front and rear Complete extraction thanks to telescopic rails available for servers with hot replace components Shipment Optional ex works fully mounted and tested including cabling Shipment including 4 heavy duty castors and 4 adjusting feet on a shock absorbing pallet Other features Extension can be placed horizontally in a row provided identical variants are used Operation in normally ai...

Страница 13: ...cal descriptions of services that only the service department of Fujitsu Technology Solutions GmbH or appropriately trained specialist staff are allowed to carry out 1 3 Where to find which information On the customer documentation CD which is part of the rack delivery you will find the PRIMECENTER M1 19 inch Rack User Manual in pdf format In addition the delivery package comprises a printed versi...

Страница 14: ...e is described in the respective manuals for these devices You will find additional information in the Safety Notes and Regulations manual in the documentation for the individual components installed in the rack Quick Start Guides In these guides you will find precautions and information about unpacking checking and installing the rack and its components Safety Notes and regulations The safety ins...

Страница 15: ...ces to other chapters sections or manuals Ê Identifies an action that you need to take I Alerts you to important information notes and tips V CAUTION Warning sign indicating that your health the correct functioning of your system or the security of your data may be at risk if you ignore the information given at this point ...

Страница 16: ...16 Preface cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k01 ...

Страница 17: ...package till its installation location Make sure the floor at the final place of installation has sufficient load bearing capacity Always ensure that the anti tilt plate is mounted when you set up the PRIMECENTER M1 19 inch rack and teleskopic rails are used risk of tipping over When connecting or disconnecting cables refer to the relevant notes in the section Connecting and disconnecting cables o...

Страница 18: ...nstructions in the user manual of the server If necessary have other people help you mount the individual components in the rack because of the weight involved Before pushing extended telescopic rails back into the rack pull the ball cage of the telescopic rail forward as far as it will go Install only system expansions that satisfy the requirements and rules governing safety If you install other ...

Страница 19: ...the assembly when installing and adding on components The maximum mounting height for the PRIMECENTER M1 19 inch rack is 16 24 42 height units HU One height unit corresponds to 44 45 mm see page 44 Observe the following rules when mounting the components Mount the components in the rack from bottom to top Mount heavy parts at the bottom e g the uninterruptible power supply Mount the keyboard or ra...

Страница 20: ... primergy concept for the Japanese market Energy saving information Devices that do not need to be constantly switched on should be switched off until they are needed as well as during long breaks and after completion of work Notes on Saving Energy Devices that do not have to be on permanently should not be switched on until they are needed and should be switched off during long breaks and when wo...

Страница 21: ...21 Important Information Fujitsu Technology Solutions GmbH Recycling Center D 33106 Paderborn Tel 49 5251 525 1410 Fax 49 5251 525 321410 ...

Страница 22: ...22 Important Information cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k02 ...

Страница 23: ...high availability functions of the servers e g hot plug hard disks hot plug fans The rack anti tilt protection required in case of maintenance must be mounted under the rack and pulled out in case of service Several rack servers can be operated simultaneously via an electronic switch console switch using just one monitor and one keyboard Improved access control based on lockable doors or optional ...

Страница 24: ...d 32 channels Switching over is carried out by means of hotkeys or the OSD on screen display function Digital KVM Keyboard Video Mouse switches can be used to integrate rack systems in a LAN and administered worldwide UPS systems The availability of the systems can be increased through the use of optional UPS interruptible power supply modules These provide the systems with adequate protection aga...

Страница 25: ...stem Once the required configuration has been created the SystemArchitect also provides further information concerning the appropriate installation requirements power connection heat dissipation weight and the requisite footprint as well as the maximum floor loading at the installation site A conflict is created when the weight of a configuration exceeds 1 000 kg and a warning is given as of Syste...

Страница 26: ... used Connection kits for single phase and three phase supply are available as is a three phase non detachable connection Reliable grounding in the rack is ensured by the use of IEC60309 connectors The power supply components are ideal for these applications and the design of the power supply ensures reliable and permanent grounding IEC 60320 connectors are used inside the rack If grounding in a p...

Страница 27: ...arations This chapter describes the preparations for installation and all the tasks involved in setting up and operating the PRIMECENTER M1 19 inch rack The service areas Figure 2 Service areas for 700 mm racks ...

Страница 28: ... 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k04 Figure 3 Service areas for 600 mm racks The figures above show the specific service areas for 700 mm see figure 2 on page 27 and 600 mm see figure 3 racks ...

Страница 29: ...1 19 inch rack from the transport palette I For a description to roll off the rack from the transport palette please refer to the info sheet delivered with the rack 4 3 Setting up the PRIMECENTER M1 19 inch rack Introduction To ensure that the rack has a firm foothold it is necessary to align it in all 3 axis exactly horizontal Required tools The following tools are required to perform this task H...

Страница 30: ...pcr m1 rack um en pcrm1 rack um en k04 Performing the task Figure 4 Screwing down the leveling feet Ê Screw down the four leveling feet using a 6 mm hexagon key I The leveling feet are easier to adjust if not carrying the full weight of the rack If necessary please ask another person to tilt the rack slightly in order to relieve the leveling foot in question ...

Страница 31: ...uous vertical line 4 4 Installing the tilting protection V CAUTION A tilting protection is mandatory as soon as one component is installed that can be pulled out e g for maintenance reasons via teleskopic rails The tilting protection prevents the rack from tipping over The tilting protection must make firm contact with the ground at the front Make sure that no cables were cut off when installing a...

Страница 32: ... um en k04 4 5 Opening the rack door The door of the rack has to be opened carefully as described below Figure 6 Opening the rack door 1 Turn the key clockwise as far as it will go 1 2 Grasp the green marked grip and swivel it in the direction of the arrow 2 Closing the rack door proceeds in reverse order I A description to convert the door can be found in chapter Appendix on page 109 0 ...

Страница 33: ... you to mount it see figure 7 Performing the task Figure 7 Inserting cage nuts Ê Insert the cage nut as shown in the figure with the bottom part of the cage in the appropriate mounting hole of the support upright 1 Ê Use the tool supplied to lever the upper part of the cage nut into the mounting hole as shown 2 The cage nut should lock into the mounting hole as shown 3 ...

Страница 34: ...s for the power supply of the rack components Performing the task Ê Mark the position of the components to be fitted on the four support uprights I In order to facilitate the positioning assembly aids are shipped with the rack components Figure 8 Inserting spring nuts Ê Insert the spring nut into the appropriate groove on the support upright at the marked location 1 4 Ê If necessary slide the spri...

Страница 35: ...ssible from the rear and is used for mounting the rack components horizontally if not already occupied by other components Before you prepare the PRIMECENTER M1 19 inch rack and start mounting components you should use the SystemArchitect see next paragraph Also observe the information in the section Notes on mounting the rack components on page 19 V CAUTION Make sure the floor at the final place ...

Страница 36: ...umentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k05 Figure 9 Screen of the SystemArchitect I More information can be found at the following web site http configurator ts fujitsu com public public_en html ...

Страница 37: ...the height unit HU One height unit comprises a 3 hole section in the front area and mounting area starts and ends with a narrow metal bar and corresponds to 44 45 mm or 1 inches The height units are numbered consecutively in ascending order from 1 upwards on each vertical support upright Figure 10 Height unit HU 1 HE 1 HE 1 HU ...

Страница 38: ...nted in the front 19 inch area of the PRIMECENTER M1 19 inch rack using either telescopic rails or rails with L brackets Light weight components can also be mounted via the front panel e g switches which can be installed with screws on the front support uprights If components are mounted using telescopic rails all the cables leading to the components are routed to the component s rear side via a c...

Страница 39: ...port brackets for 1 HU left 2 HU middle and 3 HU right Support brackets with a load capacity of 15 kg 1 HU of 35 kg 2 HU of 50 kg 3 HU and of 200 kg 10 HU are available A cable clip can be mounted on each support bracket for vertical cabling The support bracket is mounted at the appropriate height on the rear left support upright and is used to fasten the left sliding or telescopic rail at the rea...

Страница 40: ...2_work pcr m1 rack um en pcrm1 rack um en k05 Performing the task Figure 12 Sample of mounting a 2 HU support bracket Ê Mount the support bracket as shown and screw it to the rear left support upright at the appropriate height using the delivered screws Ê If necessary you can mount one additional cable clip to each support bracket for vertical cabling 2x ...

Страница 41: ...her than at the front Figure 13 Example of how to mount a rack component in the 19 inch area at the back Ê Mount the rack component using the support uprights 1 Only for asymmetrical PRIMECENTER M1 19 inch racks An appropriate support bracket is required for mounting rack components on the left hand side If you cannot use an existing bracket you will have to mount a new support bracket at the appr...

Страница 42: ...sion area to the left of the 19 inch area I The expansion area is only available in 700 mm racks The following applies to symmetrical 700 mm racks Only 19 inch rack components with a height of 1 HU can be mounted The following applies to asymmetrical 700 mm racks Only 19 inch rack components with a height of 2 HU can be mounted The cable management only possible in 700 mm asymmetrical racks restri...

Страница 43: ...ts Figure 14 Mounting a rack component in the expansion area Ê Remove the cover 3 from the appropriate slot Ê Insert the cage nuts as required for the component to be installed 1 Ê Install the rack component 2 and cover any resulting gap with an appropriate cover ...

Страница 44: ...routed in the lower area within asymmetrical racks only on the left frontside view within symmetrical 700 mm racks on the right and on the left frontside view as well as in the back of the 19 inch server area Cable routing through the false floor Figure 15 Cable routing through the false floor I The plugs of the socket strips have to be routed through the false floor Otherwise the plugs have to be...

Страница 45: ...re shows the cable cut outs in the bottom area in 600 mm racks Figure 16 Cable cut outs for cable routing in the bottom area Cut outs for cable routing in the botton area in 600mm Racks only 71x105 118 71 118 71 105 98 Reserved for tilt protection ...

Страница 46: ...05 Cable cut out at the lower rear door A cable cut out so called cat door can be found at the lower end of the right rear door see following figure To install the cat door proceed as follows Figure 17 Cover for the cable cut out at the lower rear door Ê Unscrew the 5 screws that fix the cover for the cat door Ê Confect two edge protectors length 70 mm 2 from the edge protector oval 1 0 ...

Страница 47: ...7 Cable Inlets and Outlets Figure 18 Cable cut out with edge protectors Ê Mount the edge protectors to the cut out see following figure I Make sure that both edge protectors are flush with the door edge ...

Страница 48: ... the cat door A plastic brush can be mounted optionally to the opening see following figure Figure 19 Fastening point for the brush Ê Screw the brush with one screw onto the rear door I Take care that the brush is installed horizontal and fasten the screw with a torque value of 2 5 Nm Figure 20 Cables leaving the rack through the cat door Ê Lead the cables through the cat door as shown in the figu...

Страница 49: ...wo special cut outs have been foreseen which can be opened by cutting through the micro joints of the cover sheet I Cable routing via the cut out without the brush panel kit is not allowed because cables may be damaged by sharp edges The following parts are delivered with the brush panel kit Figure 21 Delivered parts of the brush panel kit 1 Edge protector 2 Top cover brush 2x 0 ...

Страница 50: ...t für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k05 Figure 22 Cutting through the micro joints Ê Cut through the micro joints of the top cover cable cut out ...

Страница 51: ...ng the edge protector Ê Mount the edge protector around the top cover cut out to prevend cable damaging by sharp edges see arrows Figure 24 Cable cut out on top with brush panel kit Ê Mount the two brushes at both sides of the top cover cut out 0 ...

Страница 52: ...52 Cable Inlets and Outlets cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k05 ...

Страница 53: ...ble management I The lateral cable management can only be used in asymmetrical 700 mm PRIMECENTER M1 19 inch racks Introduction The lateral cable management for 19 inch DC PC racks is used for rack components that are mounted in the rack using telescopic rails The mounting height of the lateral cable management depends on the rack component to be installed and must not interfere with the telescopi...

Страница 54: ...ent for 19 inch DC PC racks Ê Insert the lateral cable management into the openings in the special upright see circle at the appropriate height as shown Ê Fasten the lateral cable management to the rear support upright using two centering screws see arrows The lateral cable managements for some rack components can be installed completely in the free height units A distance should be left to the ne...

Страница 55: ...y fashion at appropriate locations in the rack The other cable clips supplied can be distributed over the rack and mounted on the support brackets as needed Performing the task Figure 26 Mounting cable guides with cable clips Ê Insert the cable guide with cable clips into the support upright for the cable guide 1 at the appropriate height as shown in the figure above Ê Fasten the cable guide with ...

Страница 56: ...cable Connect or disconnect cables in the sequence shown below 6 2 1 Connecting Cables I Observe the safety notes in chapter Important Information on page 17 Performing the task Ê Switch off all affected devices Ê The power plugs of all affected devices must be pulled out of the sockets on the socket strip in the PRIMECENTER M1 19 inch rack Ê Attach all cables to the devices Mark the cables and no...

Страница 57: ... the system 6 2 2 Disconnecting Cables Performing the task Ê Switch off all affected devices Ê Pull the power plugs of all affected devices out of the sockets on the socket strip in the PRIMECENTER M1 19 inch rack Ê Pull all data transmission cables out of the sockets provided for the data transmission or telephone networks Ê Disconnect all cables on the devices ...

Страница 58: ...th an installed device all external cables must be routed in these guides If the installed lateral cable managements are not sufficient for the number of cables you must install additional ones The lateral cable managements must be installed 1 HU apart If this is not possible the cables must be routed in the rack before installing the device For easier access to the lateral cable managements you c...

Страница 59: ...e rack The following photo shows as a sample how to route cables in the rack Figure 28 Sample of cable routing within a 600 mm rack The following aids are useful to route the cables within the rack 1 Cable management arm 2 Cable ties 3 Cable arm 4 Hook and loop tape ...

Страница 60: ...TS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k06 6 3 2 Routing cables using a lateral cable management Performing the task Figure 29 Routing cables using a lateral cable management for 19 inch DC PC racks Ê Route the cables as shown in the figure above n ...

Страница 61: ...s inserted in the PRIMECENTER M1 19 inch rack and secured The cables are attached to the relevant plug connectors and should be routed in the lateral cable management system with a reserve length by making a loop over the center axis of the rack component see figure 30 Figure 30 Rack top view rack component inserted and secured lateral cable management ...

Страница 62: ...n the lateral cable management are also pulled out The lateral cable management stabilizes the cables at the appropriate rack component height and thus ensure a trouble free insertion and removal see figure 31 below and figure 32 on page 63 The mechanical attachment is performed using the strain relief fitting on the connectors Figure 31 Rack top view rack component pulled out half way 50 lateral ...

Страница 63: ...63 Connecting and Disconnecting Cables Figure 32 Rack top view rack component pulled out fully 105 front of the Rack connectors lateral cable management loom of cables ...

Страница 64: ...The example below shows you how to route excess lengths of cable in the PRIMECENTER M1 19 inch rack using a cable guide with cable clips V Caution In the case of fiber optic cables a minimum bending radius must be adhered to I The cable guide with cable clips can only be used in asymmetrical 700 mm PRIMECENTER M1 19 inch racks Figure 33 Routing cables using a cable guide with cable clips Ê Route t...

Страница 65: ...les directly to a rack component installed on sliding rails Figure 34 Routing cables of a rack component with direct connection Ê Route the cables in the side area of the rack as shown in the figure above V CAUTION The ventilation slots of the devices installed underneath must not be covered by the cables ...

Страница 66: ...66 Connecting and Disconnecting Cables cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k06 ...

Страница 67: ...320 Single phase Blade PDU 10 sockets 6x16 A 4x10 A PDU 50A 2U 6x16A 4x10A IEC 60320 Single phase Blade PDU w o plug 15 sockets 9x 16 A 6x 10 A Socket strip 3x3 16A 3x2 10A IEC322 Blade PDU with CEE plug 3 ph 32 A red and Fuses 24 sockets Socket strip 3 phase 3x8 sockets with CEE plug 3x16 A red 8 sockets Socket strip 8x 10A IEC60320 32A IEC60309 plug Single phase with CEE plug 32 A and Fuses 10 s...

Страница 68: ...d 3 phase socket strips V CAUTION Remember in configurations with several mains supply cables that all cables must be disconnected before working with the cabling so that there is no current flowing to the rack The power supply complies with the requirements of the EN60950 regulations This allows a PRIMECENTER M1 19 inch rack to be connected with flexible 3 or 5 wire cables to a rated current of u...

Страница 69: ...e mounting brackets PDU brackets These PDU brackets see following figure can be mounted in various heights on both sides of the rack s rear side Figure 35 Samples of the short left side and the long PDU bracket right side Required tools The following tools are required to perform this task Torx screwdriver ...

Страница 70: ... pcrm1 rack um en k07 Performing the task Figure 36 Two installed spring nuts Ê Install the spring nuts M5 into the groove of the rear pillars see circles as described in section Inserting Spring Nuts on page 34 Figure 37 Installed PDU bracket Ê Mount the PDU brackets into the groove of the rear pillars using two spring nuts M5 and two screws M5x10 mm see circles ...

Страница 71: ...ocket strips onto PDU kit 3HU I Horizontal mounting is the only way to mount socket strips into a 600 mm rack Figure 38 PDU kit 3HU mounted in the rack Required tools The following tools are required to perform this task Torx screwdriver ...

Страница 72: ... Figure 39 Mounting socket strips onto the PDU kit 3HU Ê First of all screw the desired socket strip s onto each holder extension lead of the PDU kit 3HU as shown in figure above see circles Figure 40 Installation description of the PDU kit 3HU Ê Install the PDU kit 3HU into the rack as described in the provided installation sheet see figure above I The PDU kit 3HU may only be mounted from HU 7 up...

Страница 73: ...artners ts fujitsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 41 32 A single phase 5 way socket strip Required tools The following tools are required to perform this task Torx screwdriver No of sockets 10 A No of sockets 16 A Type of plug Max current 2x IEC 60320 C13 3x IEC 60320 C19 blue 32 A IEC 60309 1 phase 32 A ...

Страница 74: ...alling PDU brackets on page 69 Figure 42 5 way socket strip mounted vertically in a 700 mm wide asymmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 4x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation only possible on the left rear side front s...

Страница 75: ... 2 screws each onto the PDU brackets I Installation is possible on both sides Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 4x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation is only possible on the rear side Cable routing is restricted Installation of cable arms at the same height is not possible Max 4x with PDU ...

Страница 76: ...t 3 HU as described on page 71 Figure 44 5 way socket strip mounted horizontally in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU in the required height into the rack I The PDU kit 3 HU may only be mounted from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max 4x with PDU kit 3 HU 24 HU Not possible Max 4x with PDU kit...

Страница 77: ... ts fujitsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 45 Single phase 10 way socket strip without plug Required tools The following tools are required to perform this task Torx screwdriver No of sockets 10 A No of sockets 16 A Type of plug Max current 4x IEC 60320 C13 6x IEC 60320 C19 none 50 A ...

Страница 78: ...ribed on page 69 Figure 46 Single phase 10 way socket strip w o plug mounted in a 700 mm wide asymm rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 2x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation only possible on the left rear side front side view ...

Страница 79: ...ip with 2 screws onto the PDU brackets I Installation is possible on both sides Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 2x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation is only possible on the rear side Cable routing is restricted Installation of cable arms at the same height is not possible Max 2x with PD...

Страница 80: ...it 3 HU as described on page 71 Figure 48 10 way socket strip Blade PDU mounted in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU in the required height into the rack I The PDU kit 3 HU may only be mounted from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max 2x with PDU kit 3 HU 24 HU Not possible Max 2x with PDU kit ...

Страница 81: ...itsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 49 32 A three phase socket strip Required tools The following tools are required to perform this task Torx screwdriver No of sockets 10 A No of sockets 16 A Type of plug Max current 6x IEC 60320 C13 9x IEC 60320 C19 red 32 A IEC 60309 3 phase 3x 32 A ...

Страница 82: ...escribed on page 69 Figure 50 32 A three phase socket strip mounted in a 700 mm wide asymmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 2x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation only possible on the left rear side front side view Ca...

Страница 83: ... a 700 mm wide symmetrical rack Rack height Installation direction vertically Installation direction horizontally 42 HU conditionally possible1 Max 2x with PDU kit 3 HU 24 HU conditionally possible1 1 Installation is only possible on the rear side Cable routing is restricted Installation of cable arms at the same height is not possible Max 2x with PDU kit 3 HU Table 9 Installation options for asym...

Страница 84: ...Install the socket strip onto the socket strip RMK 2U horizontal as described on page 71 Figure 52 32 A three phase 15 way socket strip mounted in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU in the required height into the rack I The PDU kit 3 HU may only be mounted from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible ...

Страница 85: ...u com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 53 Three phase socket strip with 3x8 sockets Required tools The following tools are required to perform this task Torx screwdriver No of sockets 10 A No of sockets 16 A Type of plug Max current 24x IEC 60320 C13 none red 16 A IEC 60309 3 phase 3x16 A ...

Страница 86: ...asymmetrical racks Performing the task Ê Install two PDU brackets as described on page 69 Figure 54 3 phase socket strip w 3x8 sockets mounted 2x in a 700 mm wide asymmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU 2x Not possible 24 HU 1x Not possible Table 11 Installation options fo...

Страница 87: ...o PDU brackets as described on page 69 Figure 55 3 phase socket strip w 3x8 sockets mounted 2x in a 700 mm wide symmetrical rack Rack height Installation direction vertically Installation direction horizontally 42 HU 2x Not possible 24 HU 1x Not possible Table 12 Installation options for 700 mm wide asymmetrical racks ...

Страница 88: ... Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k07 Ê Screw the socket strip with 2 screws each onto the PDU brackets I Installation is possible on both sides 7 3 4 3 Installation options for 600 mm wide symmetrical racks I The installation of this socket strip is not possible within this type of rack ...

Страница 89: ...jitsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 56 Single phase 8 way socket strip with 32 A IEC 60309 plug Required tools The following tools are required to perform this task Torx screwdriver No of sockets 10 A No of sockets 16 A Type of plug Max current 8x IEC 60320 C13 none blue 32 A IEC 60309 32 A ...

Страница 90: ... racks Performing the task Ê Install two PDU brackets as described on page 69 Figure 57 Single phase 8 way 10 A socket strip mounted in a 700 mm wide asymmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max 4x with PDU kit 3 HU 24 HU ok Max 4x with PDU kit 3 HU Table 13 Installation...

Страница 91: ...8 way socket strip mounted 2x in a 700 mm wide symmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets I Installation is possible on both sides Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max 4x with PDU kit 3 HU 24 HU ok Max 4x with PDU kit 3 HU Table 14 Installation options for 700 mm wide asymmetrical racks ...

Страница 92: ...3 HU as described on page 71 Figure 59 Single phase 8 way 10 A socket strip mounted in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU into the rack on the desired height I The PDU kit 3 HU has to be installed from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max 4x with PDU kit 3 HU 24 HU Not possible Max 4x with PDU k...

Страница 93: ...m com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 60 Single phase 10 way socket strip with IEC 60309 plug No of sockets 10 A No of sockets 16 A Type of plug Max current 10x IEC 60320 C13 none blue 16 A IEC 60309 16 A 10x IEC 60320 C13 none 16 A NEMA L 6 30 16 A 10x IEC 60320 C13 none 16 A IEC 60320 C20 for UPS units 16 A ...

Страница 94: ...mentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k07 Figure 61 Single phase 10 way socket strip with NEMA L6 30 plug Figure 62 Single phase 10 way socket strip with C20 plug for UPS units ...

Страница 95: ...described on page 69 Figure 63 Single phase 10 way socket strip mounted in a 700 mm wide asymmetrical rack Ê Screw each socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installationdirectionhorizontally 42 HU ok ok 24 HU ok ok Table 16 Installation options for 700 mm wide asymmetrical racks ...

Страница 96: ...ical racks Performing the task Ê Install the PDU brackets as described on page 69 Figure 64 Single phase 10 way socket strip mounted in a 700 mm wide symmetrical rack Ê Screw each socket strip with 2 screws onto the PDU brackets I Installation is possible on both sides Rack height Installation direction vertically Installation direction horizontally 42 HU 2x ok 24 HU ok ok Table 17 Installation op...

Страница 97: ...in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU into the rack on the desired height I The PDU kit 3 HU has to be installed from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max 4x with PDU kit 3 HU 24 HU Not possible Max 4x with PDU kit 3 HU 16 HU Not possible Max 4x with PDU kit 3 HU Table 18 Installation options fo...

Страница 98: ...gs and assembly Introduction I For more information see the configurator https partners ts fujitsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 66 Socket strip extension 3 safety plugs and assembly Required tools The following tools are required to perform this task Torx screwdriver No of C13 type sockets No of safety sockets Type of plug Max current No...

Страница 99: ...t strip extension 3 safety plugs and assembly mounted 2x in a 700 mm wide asymmetrical rack Ê Screw the socket strips with 2 screws each onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max 4x with PDU kit 3 HU 24 HU ok Max 4x with PDU kit 3 HU Table 19 Installation options for 700 mm wide asymmetrical racks ...

Страница 100: ...rforming the task Ê Install the PDU brackets as described on page 69 Figure 68 Socket strip extension 3 safety plugs and assembly mounted in a 700 mm wide symmetrical rack Ê Screw the socket strips with 2 screws each onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU ok Max 4x with PDU kit 3 HU 24 HU ok Max 4x with PDU kit 3 HU Table 20 In...

Страница 101: ...y mounted in a 600 mm wide symmetrical rack Ê Install the PDU kit 3 HU into the rack on the desired height I The PDU kit 3 HU has to be installed from HU 7 upwards Rack height Installation direction vertically Installation direction horizontally 42 HU Not possible Max 4x with PDU kit 3 HU 24 HU Not possible Max 4x with PDU kit 3 HU 16 HU Not possible Max 4x with PDU kit 3 HU Table 21 Installation ...

Страница 102: ...trip and assembly Introduction I For more information see the configurator https partners ts fujitsu com com order supply configurators primergy_config Pages Currentconfigurators aspx Figure 70 Single phase socket strip with 5 plugs and assembly Required tools The following tools are required to perform this task Torx screwdriver No of C13 type sockets No of safety sockets Type of plug Max current...

Страница 103: ...hase socket strip with 4 1plugs and assembly mounted in a 700 mm wide asymmetrical rack Ê Screw the socket strip with 2 screws onto the PDU brackets Rack height Installation direction vertically Installation direction horizontally 42 HU ok Not mountable with PDU kit 3 HU 24 HU ok Not mountable with PDU kit 3 HU Table 22 Installation options for 700 mm wide asymmetrical racks ...

Страница 104: ... Figure 72 Socket strip with 4 1plugs and assembly mounted 2x in a 700 mm wide symm rack Ê Screw the socket strip with 2 screws onto the PDU brackets 7 3 8 3 Installation options for 600 mm wide symmetrical racks I The installation of this socket strip is not possible within this type of rack Rack height Installation direction vertically Installation direction horizontally 42 HU ok Not mountable w...

Страница 105: ...R M1 19 inch rack can be connected to the indoor potential compensating system via the grounding screw located at the lower left side of the rack chassis see photo below This grounding only protects from external parasitic voltages and does not replace the protective conductor in the mains feeders Figure 73 Grounding screw ...

Страница 106: ...at they draw Both fixed connections and connections using IEC 309 complaint connectors can be used here The technical requirements can be taken from EN60950 and from the specifications of the local utility company Online UPSs and line interactive UPSs are available in different performance classes Different UPS types are used preferentially by the various server lines for the PRIMECENTER M1 19 inc...

Страница 107: ...able holders Installation flooring Multiple socket outlets Uninterruptable power supply Rack console monitor keyboard and mouse Console switches Earthquake protection kits on request I More information can be found at http partners ts fujitsu com primergy PRIMERGY information on the Extranet http www primergy com PRIMERGY information on the Internet For further questions use the following e mail a...

Страница 108: ...108 Optional accessories cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k08 ...

Страница 109: ...x In this chapter you can find additional information on special tasks Door conversion I More information can be found at 9 1 Door conversion On the following pages you will find the description for door conversion ...

Страница 110: ......

Страница 111: ......

Страница 112: ......

Страница 113: ......

Страница 114: ......

Страница 115: ......

Страница 116: ......

Страница 117: ...110 Appendix cognitas Gesellschft für Technik Dokumentation mbH 2011 Pfad O FTS PRIMERGY HW Rack PCR M1 Rack Manuals User Manual 02_work pcr m1 rack um en pcrm1 rack um en k09 ...

Отзывы: