![Fujitsu MHW2060BK - Mobile 60 GB Hard Drive Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/fujitsu/mhw2060bk-mobile-60-gb-hard-drive/mhw2060bk-mobile-60-gb-hard-drive_maintenance-manual_121564063.webp)
4.4 Power-on Sequence
Start
Power-on
a)
Self-diagnosis 1
- MPU bus test
- Internal register
write/read test
- Work RAM write/read
test
The spindle motor starts.
Self-diagnosis 2
- Data buffer write/read
test
b)
Confirming spindle motor
speed
c)
Load the head assembly
Drive ready state
(command waiting state)
g)
Execute self-calibration
f)
Initial on-track and read
out of system information
e)
End
SATA I/F Initialization
d)
Figure 4.3 Power-on operation sequence
C141-E261
4-7
Содержание MHW2060BK - Mobile 60 GB Hard Drive
Страница 1: ...C141 E261 01EN MHW2120BK MHW2080BK MHW2060BK DISK DRIVES PRODUCT MAINTENANCE MANUAL ...
Страница 4: ...This page is intentionally left blank ...
Страница 12: ...This page is intentionally left blank ...
Страница 19: ...Contents Glossary GL 1 Acronyms and Abbreviations AB 1 Index IN 1 C141 E261 xv ...
Страница 24: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 56: ...This page is intentionally left blank ...
Страница 76: ...This page is intentionally left blank ...
Страница 254: ...Interface Device Host RegHD PIO Setup DATA Figure 5 14 PIO data in command protocol 5 178 C141 E261 ...
Страница 264: ...This page is intentionally left blank ...
Страница 286: ...This page is intentionally left blank ...
Страница 302: ...This page is intentionally left blank ...
Страница 306: ...This page is intentionally left blank ...
Страница 308: ...This page is intentionally left blank ...
Страница 316: ...This page is intentionally left blank ...
Страница 318: ......
Страница 319: ......
Страница 320: ......