
Page 29 of 49
Onl
y
i
nt
e
nded
fo
r
a
ut
horis
e
d s
e
rv
ic
e
te
c
h
nic
ia
ns
!
!
Removing the mainboard
Required work steps:
Required tools:
■
Screwdriver: Phillips PH00
■
Plastic tool
Warning!
In case of replacing the mainboard, please remove the memories, the M2. module, the LTE module, the fan and the TPM
module from the old mainboard beforehand. These components must be reconnected to the new mainboard after the
mainboard has been replaced.
►
Loosen and remove the five M2XL2.5 screws (yellow circles).
►
Open the connectors (red circles, red ovals) and remove the cables from the mainboard.
►
Now the mainboard can be removed from the device.
Warning!
There are white protective foils in the upper part of the device (see section:
Removing the white protective films
). These are
fitted to protect against an electrical short circuit. In the event of replacement of the mainboard, these films are included in
the scope of delivery when the mainboard is ordered and are fitted in the device after replacement of the mainboard.
Содержание LIFEBOOK U7411
Страница 5: ...Page 5 of 49 Tools Screwdriver Phillips PH00 Plastic tool Plastic tool Return to Table of Contents ...
Страница 40: ...Page 40 of 49 ...
Страница 41: ...Page 41 of 49 ...
Страница 42: ...Page 42 of 49 ...
Страница 43: ...Page 43 of 49 ...
Страница 44: ...Page 44 of 49 ...
Страница 45: ...Page 45 of 49 ...
Страница 46: ...Page 46 of 49 ...
Страница 47: ...Page 47 of 49 ...